  "schemaVersion": 1,
  "name": "U.S. data center construction projects",
  "url": "https://joltrents.com/data-centers/map/",
  "creator": "JOLT Mobile Offices & Containers",
  "publisher": "JOLT Mobile Offices & Containers",
  "lastUpdated": "2026-11-05",
  "license": {
    "name": "CC BY 4.0",
    "url": "https://creativecommons.org/licenses/by/4.0/",
    "attribution": "required"
  },
  "citeAs": "JOLT Mobile Offices & Containers, \"U.S. data center construction projects,\" November 5, 2026, joltrents.com, CC BY 4.0. Includes data from Epoch AI, \"Data on AI data centers,\" CC BY 4.0.",
  "sources": [
    {
      "name": "Epoch AI",
      "title": "Data on AI data centers",
      "url": "https://epoch.ai/data/ai-data-centers",
      "license": "CC BY 4.0",
      "licenseUrl": "https://creativecommons.org/licenses/by/4.0/"
    }
  ],
  "notes": [
    "Seeded from Epoch AI's open data on AI data centers (CC BY 4.0), U.S. sites only, and added to from company, state, county and utility sources. Every fact carries its own source link and date.",
    "A field with no fact on record is empty. Planned power is Epoch AI's estimate where Epoch AI is the source; Epoch AI's capital-cost figure is an estimate, not an announced investment.",
    "Stages, in order: Announced, Approved, Site work, Under construction, Operating. `stages` lists every stage change with its date and source."
  ],
  "totals": {
    "projects": 77,
    "states": 29,
    "plannedMw": 43403,
    "byStage": {
      "Announced": 0,
      "Approved": 0,
      "Site work": 1,
      "Under construction": 16,
      "Operating": 60
    }
  },
  "columns": {
    "slug": "The project's key; its page is /data-centers/projects/<slug>/",
    "name": "Project name",
    "url": "The project's page on joltrents.com",
    "state": "State (USPS code)",
    "state_name": "State",
    "city": "City, when on record",
    "county": "County, when on record",
    "latitude": "Latitude (WGS84), when on record",
    "longitude": "Longitude (WGS84), when on record",
    "location_precision": "How exact the coordinates are: address, parcel, city, county or state",
    "location_source_url": "Source of the location",
    "stage": "Stage now: Announced, Approved, Site work, Under construction or Operating",
    "stage_date": "The date the project reached its current stage (YYYY-MM-DD)",
    "stage_source_name": "Source of the current stage",
    "stage_source_url": "Source link of the current stage",
    "developer": "Developer or owner",
    "developer_source_url": "Source link for developer",
    "developer_source_date": "Source date for developer (YYYY-MM-DD)",
    "tenant": "Tenant or user",
    "tenant_source_url": "Source link for tenant",
    "tenant_source_date": "Source date for tenant (YYYY-MM-DD)",
    "planned_mw": "Planned power in megawatts (Epoch AI's estimate where Epoch AI is the source)",
    "planned_mw_source_url": "Source link for planned_mw",
    "planned_mw_source_date": "Source date for planned_mw (YYYY-MM-DD)",
    "announced_investment_usd": "Announced investment in U.S. dollars, as announced",
    "announced_investment_usd_source_url": "Source link for announced_investment_usd",
    "announced_investment_usd_source_date": "Source date for announced_investment_usd (YYYY-MM-DD)",
    "epoch_capital_cost_estimate_usd": "Epoch AI's capital-cost estimate in U.S. dollars (an estimate, not an announcement)",
    "epoch_capital_cost_estimate_usd_source_url": "Source link for epoch_capital_cost_estimate_usd",
    "epoch_capital_cost_estimate_usd_source_date": "Source date for epoch_capital_cost_estimate_usd (YYYY-MM-DD)",
    "acres": "Site acres",
    "acres_source_url": "Source link for acres",
    "acres_source_date": "Source date for acres (YYYY-MM-DD)",
    "buildings": "Number of buildings",
    "buildings_source_url": "Source link for buildings",
    "buildings_source_date": "Source date for buildings (YYYY-MM-DD)",
    "general_contractor": "General contractor",
    "general_contractor_source_url": "Source link for general_contractor",
    "general_contractor_source_date": "Source date for general_contractor (YYYY-MM-DD)",
    "utility_or_energy_company": "Utility or energy company",
    "utility_or_energy_company_source_url": "Source link for utility_or_energy_company",
    "utility_or_energy_company_source_date": "Source date for utility_or_energy_company (YYYY-MM-DD)",
    "last_changed": "The newest date on any of the project's facts, stages or notes (YYYY-MM-DD)"
  },
  "rowCount": 77,
  "projects": [
    {
      "slug": "amazon-madison-mega-site",
      "name": "Amazon Madison Mega Site",
      "url": "https://joltrents.com/data-centers/projects/amazon-madison-mega-site/",
      "state": "MS",
      "state_name": "Mississippi",
      "city": "Canton",
      "county": null,
      "latitude": 32.612602,
      "longitude": -90.036751,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-06-23",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Amazon",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-04",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 819,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-04",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 25873406000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-04",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-04",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-10-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-03-11",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-06-23",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-04",
          "note": "Buildings 6 and 7 roof completed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-04",
          "note": "Confirmation that five buildings are fully equipped with cooling and backup generators.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-23",
          "note": "Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-03-11",
          "note": "Generators and chillers still being installed on buildings 1-5.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-10-02",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1lhSF8TBA7fNWsN4Onj-nfL7X_-BN573r/view?usp=sharing",
          "title": "Air Construction Permit"
        },
        {
          "url": "https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html",
          "title": "Backup diesel generator referenced in the permit"
        },
        {
          "url": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html",
          "title": "New York Times article on Project Rainier"
        },
        {
          "url": "https://newsletter.semianalysis.com/p/amazons-ai-resurgence-aws-anthropics-multi-gigawatt-trainium-expansion",
          "title": "SemiAnalysis article with imagery of Canton they have labeled as being an Amazon-Anthropic collaboration"
        }
      ]
    },
    {
      "slug": "amazon-ridgeland",
      "name": "Amazon Ridgeland",
      "url": "https://joltrents.com/data-centers/projects/amazon-ridgeland/",
      "state": "MS",
      "state_name": "Mississippi",
      "city": "Ridgeland",
      "county": "Madison County",
      "latitude": 32.399544,
      "longitude": -90.120486,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-05-15",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Amazon",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-15",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 1008,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 31820880000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Entergy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-05-15",
      "last_changed": "2026-05-15",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-02-24",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-10-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-05-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-15",
          "note": "Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-04",
          "note": "Roof complete on Buildings 3.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-02-24",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1dQ5Pxl7rQAHLvHoTYrpOX32WAolo46d7/view?usp=sharing",
          "title": "Air Construction Permit"
        },
        {
          "url": "https://drive.google.com/file/d/1myQ6BYqqzcfsWwv41tufHobvA8T3qo_d/view?usp=sharing",
          "title": "Permit review document"
        },
        {
          "url": "https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html",
          "title": "Backup diesel generator referenced in the permit"
        },
        {
          "url": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html",
          "title": "New York Times article on Project Rainier"
        }
      ]
    },
    {
      "slug": "anthropic-barber-lake",
      "name": "Anthropic Barber Lake",
      "url": "https://joltrents.com/data-centers/projects/anthropic-barber-lake/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Colorado City",
      "county": "Mitchell County",
      "latitude": 32.399486,
      "longitude": -100.858304,
      "location_precision": "city",
      "location_source_url": "https://www.datacenterdynamics.com/en/news/cipher-mining-secures-fluidstack-as-a-customer-and-google-as-an-investor/",
      "stage": "Under construction",
      "stage_date": "2025-11-29",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Cipher Mining",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-30",
      "tenant": "Anthropic",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-07-30",
      "planned_mw": 300,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 7841574000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-09-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-11-29",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-30",
          "note": "Building 1 shell is complete, with rooftop units installed, and most air-cooled chillers in place in a ground yard to the north.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-29",
          "note": "Foundations of Building 1 are visible.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-18",
          "note": "Site grading and civil works begin.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.globenewswire.com/news-release/2025/09/25/3156107/0/en/Cipher-Mining-Signs-168-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html",
          "title": "Cipher signs 168 MW AI hosting deal with Fluidstack, Google backs it (Sep 2025)"
        },
        {
          "url": "https://www.globenewswire.com/news-release/2025/11/20/3191801/0/en/Cipher-Mining-Signs-Additional-56-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html",
          "title": "Cipher adds 56 MW gross to reach 300 MW at Barber Lake (Nov 2025)"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010325015073/dp237633_ex9901.htm",
          "title": "Cipher 8-K exhibit: 207 MW total critical IT load (SEC, Nov 2025)"
        },
        {
          "url": "https://www.googlecloudpresscorner.com/2025-10-23-Anthropic-to-Expand-Use-of-Google-Cloud-TPUs-and-Services",
          "title": "Anthropic to expand use of Google Cloud TPUs (Oct 2025)"
        },
        {
          "url": "https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure",
          "title": "Anthropic $50B US AI infrastructure with Fluidstack (Nov 2025)"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/cipher-mining-secures-fluidstack-as-a-customer-and-google-as-an-investor/",
          "title": "DCD: Cipher secures Fluidstack as customer, Google as investor"
        },
        {
          "url": "https://drive.google.com/file/d/1hzNlH8549ppuCwvKfMo--3PsD-hYBJDa/view?usp=sharing",
          "title": "Air quality permit listing 60 x 3 MW plus 60 x 3.1MW backup generators"
        }
      ]
    },
    {
      "slug": "anthropic-lake-mariner",
      "name": "Anthropic Lake Mariner",
      "url": "https://joltrents.com/data-centers/projects/anthropic-lake-mariner/",
      "state": "NY",
      "state_name": "New York",
      "city": "Barker",
      "county": "Niagara County",
      "latitude": 43.34894,
      "longitude": -78.603357,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-05-31",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "AI XPV Platform",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-10-31",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 441,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-10-31",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 14319396000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-10-31",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-10-31",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-06-11",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-03-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-05-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-10-31",
          "note": "Building 2 is operational.",
          "source": "Epoch AI, citing investors.terawulf.com",
          "sourceUrl": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results"
        },
        {
          "date": "2026-07-23",
          "note": "Building 1 looks complete, consistent with it going operational back in May.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-31",
          "note": "Building 1 is operational.",
          "source": "Epoch AI, citing investors.terawulf.com",
          "sourceUrl": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results"
        },
        {
          "date": "2026-03-02",
          "note": "Building 1 appears to have a complete shell and cooling equipment.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-11",
          "note": "Land clearing begins for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results",
          "title": "Terawulf press release with details and timeline for Buildings 1-5"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-offers-its-tpus-to-ai-cloud-providers-report/",
          "title": "DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner"
        },
        {
          "url": "https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure",
          "title": "Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York"
        }
      ]
    },
    {
      "slug": "anthropic-amazon-new-carlisle",
      "name": "Anthropic-Amazon New Carlisle",
      "url": "https://joltrents.com/data-centers/projects/anthropic-amazon-new-carlisle/",
      "state": "IN",
      "state_name": "Indiana",
      "city": "New Carlisle",
      "county": "St. Joseph County",
      "latitude": 41.693774,
      "longitude": -86.460524,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-06-23",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Amazon",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-10-19",
      "tenant": "Anthropic",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-10-19",
      "planned_mw": 2310,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-10-19",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 72922850000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-10-19",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-10-19",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-02-09",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-05-10",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-06-23",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-10-19",
          "note": "Buildings 17-18 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-06-03",
          "note": "Buildings 17-18 fully roofed but still having surrounding generators/cooling under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-23",
          "note": "Buildings 12-16 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-09",
          "note": "Buildings 12-16 still have a few generators that look incomplete, so they are unlikely to be operational just yet.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-23",
          "note": "Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-17",
          "note": "Confirmation that nearly 500,000 chips are operational, which fits buildings 1-7.",
          "source": "Epoch AI, citing youtube.com",
          "sourceUrl": "https://www.youtube.com/watch?v=jwgW_gHI1Vs&t=220s"
        },
        {
          "date": "2025-09-26",
          "note": "Roof complete on building 16.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-23",
          "note": "Buildings 1-7 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-05-10",
          "note": "Roof complete on building 11.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-06-10",
          "note": "Land clearing begins in the southern section.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-02-09",
          "note": "Land clearing begins in the northern section.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1BKiTFNUk2KDaUaiHG7fz0KlkNSBTHzbb/view?usp=sharing",
          "title": "Air Construction Permit application for the northern portion"
        },
        {
          "url": "https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets/117341.html",
          "title": "Backup diesel generator referenced in the permit"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
          "title": "Announcement of Project Rainier coming online"
        },
        {
          "url": "https://t.co/HsAO7oyKa2",
          "title": "Air permit for Buildings 19-32, suggesting expansion to 2.3 GW total facility power"
        }
      ]
    },
    {
      "slug": "aws-berwick",
      "name": "AWS Berwick",
      "url": "https://joltrents.com/data-centers/projects/aws-berwick/",
      "state": "PA",
      "state_name": "Pennsylvania",
      "city": "Berwick",
      "county": "Luzerne County",
      "latitude": 41.083849,
      "longitude": -76.143533,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-09-09",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Amazon",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-01",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 212,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6402058000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-01",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-07-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2023-01-17",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-09-09",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-01",
          "note": "Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-05",
          "note": "Buildings 1 and 2 visibly complete and operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-12",
          "note": "The SRBC increases approved water use from 0.060 MGD to 0.129 MGD.",
          "source": "Epoch AI, citing srbc.gov",
          "sourceUrl": "https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301"
        },
        {
          "date": "2026-01-07",
          "note": "Building 2 operational estimate.",
          "source": "Epoch AI, citing pacodeandbulletin.gov",
          "sourceUrl": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-4/56-4.pdf"
        },
        {
          "date": "2025-09-09",
          "note": "Building 1 operational estimate.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/search/Berwick,+PA/@41.08459175,-76.14321499,203.05778839a,756.59305105d,35y,0h,0t,0r/data=CiwiJgokCYCDFkPTLDRAEX6DFkPTLDTAGUGoL_2-pEVAIRNn30rGL03AQgIIAUICCABKDQj___________8BEAA"
        },
        {
          "date": "2024-06-01",
          "note": "Building 1 fit out and related construction begins under Amazon, based on the Susquehanna River Basin Commission schedule.",
          "source": "Epoch AI, citing srbc.gov",
          "sourceUrl": "https://www.srbc.gov/waav/search/GetPending?documentType=Application&isABRe=false&projectNumber=2024-056"
        },
        {
          "date": "2024-03-04",
          "note": "AWS acquires the Cumulus/Talen building campus for $650M.",
          "source": "Epoch AI, citing sec.gov",
          "sourceUrl": "https://www.sec.gov/Archives/edgar/data/1622536/000162828025023501/tln-20250331.htm"
        },
        {
          "date": "2023-01-17",
          "note": "Cumulus completes a 48 MW, 300,000 sq ft powered shell for the first data center at the Susquehanna campus.",
          "source": "Epoch AI, citing prnewswire.com",
          "sourceUrl": "https://www.prnewswire.com/news-releases/cumulus-data-completes-key-milestones-in-construction-of-its-flagship-zero-carbon-susquehanna-data-center-campus-301722751.html"
        },
        {
          "date": "2021-07-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI, citing datacenterdynamics.com",
          "sourceUrl": "https://www.datacenterdynamics.com/en/news/talen-energy-to-build-300mw-nuclear-powered-cryptomining-facility-and-data-center-in-us/"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html",
          "title": "NYT reporting that one of the Project Rainier sites may be in Pennsylvania"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1622536/000162828024036935/tln-20240630.htm",
          "title": "Talen SEC filing detailing the $650M sale of the Cumulus data center campus to AWS"
        },
        {
          "url": "https://www.puc.pa.gov/pcdocs/1861638.pdf",
          "title": "Pennsylvania PUC filing describing the planned 16-building AWS data center development"
        },
        {
          "url": "https://www.srbc.gov/about/news/docs/2025-159-final-public-comment-responses-20260128.pdf",
          "title": "SRBC filing covering AWS campus expansion and water-use plans"
        }
      ]
    },
    {
      "slug": "aws-new-albany",
      "name": "AWS New Albany",
      "url": "https://joltrents.com/data-centers/projects/aws-new-albany/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "New Albany",
      "county": "Licking County",
      "latitude": 40.115782,
      "longitude": -82.739512,
      "location_precision": "address",
      "location_source_url": "https://newalbanyohio.org/community-development/project-updates/",
      "stage": "Operating",
      "stage_date": "2024-12-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Amazon",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-18",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 405,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-18",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 12804116000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-18",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-18",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-06-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-12-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-18",
          "note": "Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-12",
          "note": "Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational.",
          "source": "Epoch AI, citing docs.aws.amazon.com",
          "sourceUrl": "https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html"
        },
        {
          "date": "2024-12-01",
          "note": "Buildings 5-9 operational.",
          "source": "Epoch AI, citing newalbanyohio.org",
          "sourceUrl": "https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf"
        },
        {
          "date": "2022-06-01",
          "note": "Land clearing begins for Buildings 5-9.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://newalbanyohio.org/community-development/project-updates/",
          "title": "City of New Albany Project Updates"
        },
        {
          "url": "https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf",
          "title": "New Albany Community Development Report - Dec. 2024"
        },
        {
          "url": "https://newalbanyohio.org/wp-content/uploads/2025/09/CD-2025-08.pdf",
          "title": "New Albany Community Development Report - Aug. 2025"
        },
        {
          "url": "https://www.wosu.org/politics-government/2023-09-20/new-albany-city-council-approves-tax-break-deal-for-3-5-billion-amazon-data-center-project",
          "title": "Article reporting first signing of the project"
        }
      ]
    },
    {
      "slug": "colossus-1",
      "name": "Colossus 1",
      "url": "https://joltrents.com/data-centers/projects/colossus-1/",
      "state": "TN",
      "state_name": "Tennessee",
      "city": "Memphis",
      "county": "Shelby County",
      "latitude": 35.082847,
      "longitude": -90.076383,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-08-11",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "SpaceXAI",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-15",
      "tenant": "Anthropic",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-15",
      "planned_mw": 442,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 12879880000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "MLGW",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-06-15",
      "last_changed": "2026-06-15",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2024-04-24",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-08-11",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-15",
          "note": "No major changes to the data center since February.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-06-01",
          "note": "Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW \"within the month\" of May.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-06",
          "note": "Anthropic announces their agreement with SpaceX to use all of the compute capacity at Colossus 1.",
          "source": "Epoch AI, citing anthropic.com",
          "sourceUrl": "https://www.anthropic.com/news/higher-limits-spacex"
        },
        {
          "date": "2026-02-11",
          "note": "All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-07",
          "note": "Third substation was expected to power the building in Fall.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-19",
          "note": "There is still construction visible in the third substation yard and next to the new cooling towers.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-17",
          "note": "Third substation looks completed, but it doesn't appear to be connected to the building yet.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-07-22",
          "note": "30k B200s added.",
          "source": "Epoch AI, citing archive.is",
          "sourceUrl": "https://archive.is/oHQSA"
        },
        {
          "date": "2025-03-06",
          "note": "Second substation almost connected.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-02-17",
          "note": "150k H100s and 50k H200s online.",
          "source": "Epoch AI, citing archive.is",
          "sourceUrl": "https://archive.is/z39uN"
        },
        {
          "date": "2024-09-02",
          "note": "100k H100s online.",
          "source": "Epoch AI, citing archive.is",
          "sourceUrl": "https://archive.is/z39uN"
        },
        {
          "date": "2024-08-11",
          "note": "First significant/useful training workload on 25k H100s.",
          "source": "Epoch AI, citing x.ai",
          "sourceUrl": "https://x.ai/colossus"
        },
        {
          "date": "2024-04-24",
          "note": "Construction starts with a road added on site, retrofitting a former Electrolux building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/17WAFThn95X85ebzA_e19R1zYycwFzAl2/view?usp=sharing",
          "title": "May 2025 Electricity Provider Disclosure"
        },
        {
          "url": "https://www.scribd.com/document/883601734/01156-01PC-070225-Permit",
          "title": "July 2025 Permit for Gas Turbines"
        },
        {
          "url": "https://cdn.arstechnica.net/wp-content/uploads/2025/07/NAACP-and-YGGs-xAI-Air-Permit-Appeal-7-15-2025.pdf",
          "title": "Southern Environmental Law Center Gas Permit Appeal, with additional satellite images"
        },
        {
          "url": "https://archive.is/oHQSA",
          "title": "Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUs"
        },
        {
          "url": "https://www.anthropic.com/news/higher-limits-spacex",
          "title": "Anthropic announcement"
        }
      ]
    },
    {
      "slug": "colossus-2",
      "name": "Colossus 2",
      "url": "https://joltrents.com/data-centers/projects/colossus-2/",
      "state": "TN",
      "state_name": "Tennessee",
      "city": "Memphis",
      "county": "Shelby County",
      "latitude": 34.999488,
      "longitude": -90.042976,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-10-19",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "SpaceXAI",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-15",
      "tenant": "Anthropic, Cursor, SpaceXAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-15",
      "planned_mw": 2065,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 57997342000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-15",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-02-28",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-09-08",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-10-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-15",
          "note": "The site is estimated to have at least ~830 MW of GPU server power, with at least \"at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power\".",
          "source": "Epoch AI, citing sec.gov",
          "sourceUrl": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm"
        },
        {
          "date": "2026-04-06",
          "note": "The first array of dry cooling air-cooled condensers for Building 1 has been completed and is operational.",
          "source": "Epoch AI, citing sec.gov",
          "sourceUrl": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm"
        },
        {
          "date": "2026-01-13",
          "note": "Since October, an array of dry cooling air-cooled condensers has been added, and appears almost complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-19",
          "note": "Battery facility looks complete.",
          "source": "Epoch AI, citing sec.gov",
          "sourceUrl": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm"
        },
        {
          "date": "2025-09-08",
          "note": "Battery facility connected to the building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-02-28",
          "note": "Land clearing begins next to the existing building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.wsj.com/tech/elon-musk-xai-memphis-tennessee-power-dec4c70d",
          "title": "WSJ profile of the Colossus data centers"
        },
        {
          "url": "https://x.com/elonmusk/status/1947701807389515912",
          "title": "Final GPU count reported by Elon Musk"
        },
        {
          "url": "https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf#page=4",
          "title": "MLGW update mentioning power requests for Colossus 2"
        },
        {
          "url": "https://x.com/SpaceX/status/2046713419978453374",
          "title": "SpaceX-Cursor partnership to use Colossus"
        },
        {
          "url": "https://x.com/nottombrown/status/2057194829986300375",
          "title": "Anthropic to use Colossus 2 from June 2026"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm",
          "title": "SpaceX S-1 filing, mentioning exact compute and power for Colossus 2"
        }
      ]
    },
    {
      "slug": "core42-lake-mariner",
      "name": "Core42 Lake Mariner",
      "url": "https://joltrents.com/data-centers/projects/core42-lake-mariner/",
      "state": "NY",
      "state_name": "New York",
      "city": "Barker",
      "county": "Niagara County",
      "latitude": 43.34894,
      "longitude": -78.603357,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-10-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Core42",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-23",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 58,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-23",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 2197156000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-23",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-23",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-23",
          "note": "Both buildings still operational according to satellite imagery.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-31",
          "note": "Building 2 is operational.",
          "source": "Epoch AI, citing investors.terawulf.com",
          "sourceUrl": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results"
        },
        {
          "date": "2026-03-02",
          "note": "Buildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery.",
          "source": "Epoch AI, citing investors.terawulf.com",
          "sourceUrl": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results"
        },
        {
          "date": "2025-10-01",
          "note": "Building 1 is operational.",
          "source": "Epoch AI, citing investors.terawulf.com",
          "sourceUrl": "https://investors.terawulf.com/news-events/press-releases/detail/126/terawulf-reports-third-quarter-2025-results"
        },
        {
          "date": "2024-10-01",
          "note": "Land clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center",
          "title": "Terawulf press release with details of Core42 lease for Buildings 1-2"
        },
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results",
          "title": "Terawulf press release with details and timeline for Buildings 1-5"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-offers-its-tpus-to-ai-cloud-providers-report/",
          "title": "DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner"
        },
        {
          "url": "https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure",
          "title": "Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York"
        }
      ]
    },
    {
      "slug": "coreweave-chester-va",
      "name": "CoreWeave Chester VA",
      "url": "https://joltrents.com/data-centers/projects/coreweave-chester-va/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Chester",
      "county": "Chesterfield County",
      "latitude": 37.361745,
      "longitude": -77.325259,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-01-31",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-20",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 197,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-20",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 4280666000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-20",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-20",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2023-09-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-01-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-20",
          "note": "Based on satellite imagery, Building 3 has cleared its land and is beginning construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-01-22",
          "note": "Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-30",
          "note": "Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-01-31",
          "note": "Building 1's second data hall scheduled to come online this month.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-09-18",
          "note": "Conversion starts at CTP-01.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/",
          "title": "Chirisa secures $200 million loan to fit out VA Data center for CoreWeave"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/blue-owl-led-jv-secures-750m-to-build-out-data-centers-for-coreweave/",
          "title": "Blue Owl-led JV secures $750m to build out data centers for CoreWeave"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/chirisa-offers-former-capital-one-data-center-in-virginia-to-hyperscalers/",
          "title": "Chirisa offers former Capital One data center in Virginia to hyperscalers"
        }
      ]
    },
    {
      "slug": "coreweave-dalton-1-and-2",
      "name": "CoreWeave Dalton 1 & 2",
      "url": "https://joltrents.com/data-centers/projects/coreweave-dalton-1-and-2/",
      "state": "GA",
      "state_name": "Georgia",
      "city": "Dalton",
      "county": "Whitfield County",
      "latitude": 34.713507,
      "longitude": -84.952185,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-02-20",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-02-20",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 40,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-02-20",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 1060696000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-02-20",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-02-20",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2024-06-03",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-02-20",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-02-20",
          "note": "Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-08-29",
          "note": "Based on Satellite imagery, Dalton 1 is still under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-05-01",
          "note": "Core Scientific investor presentation clearly shows Dalton 1 with a cleared pad on this month for construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-06-03",
          "note": "According to a few sources, Core Scientific announced that they're rebuilding their existing Dalton 1 datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date.",
          "source": "Epoch AI, citing investors.corescientific.com",
          "sourceUrl": "https://investors.corescientific.com/news-events/press-releases/detail/74/core-scientific-to-provide-approximately-200-mw-of-infrastructure-to-host-coreweaves-high-performance-computing-services-capturing-significant-ai-compute-opportunity"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://corescientific.com/high-density-data-centers/dalton-ga-dnn1-2/",
          "title": "Core Scientific page"
        },
        {
          "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf",
          "title": "SEC filing with power utility information"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/core-scientific-plans-new-ai-data-centers-in-dalton-georgia/",
          "title": "DCD article"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm",
          "title": "Core Scientific presentation"
        }
      ]
    },
    {
      "slug": "coreweave-denton-tx",
      "name": "CoreWeave Denton TX",
      "url": "https://joltrents.com/data-centers/projects/coreweave-denton-tx/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Denton",
      "county": "Denton County",
      "latitude": 33.219273,
      "longitude": -97.174715,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-05-31",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-09-01",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 395,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-09-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 10682724000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-09-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-09-01",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2024-11-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-05-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-09-01",
          "note": "Building 8 interior fit-out scheduled to begin.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247"
        },
        {
          "date": "2026-07-03",
          "note": "Buildings 1-7 are operational and running, with no construction work visible.",
          "source": "Epoch AI, citing d1io3yog0oux5.cloudfront.net",
          "sourceUrl": "https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1066/11282/pdf/Q2+FY26+earnings+deck+7.28+AM.pdf"
        },
        {
          "date": "2026-03-02",
          "note": "Buildings 1-3 are fully operational running AI.",
          "source": "Epoch AI, citing fool.com",
          "sourceUrl": "https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/"
        },
        {
          "date": "2026-02-23",
          "note": "Buildings 1-3 are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-31",
          "note": "Half the campus energized.",
          "source": "Epoch AI, citing d1io3yog0oux5.cloudfront.net",
          "sourceUrl": "https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1085/11265/presentation/Q4+FY25+earnings+deck+vfinal.2+PDF.pdf"
        },
        {
          "date": "2025-05-31",
          "note": "First 8 MW billable tranche dedicated to AI starts running at the site, with another 40 scheduled by the end of the quarter.",
          "source": "Epoch AI, citing investors.corescientific.com",
          "sourceUrl": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/q12025corescientificinc-ea.htm"
        },
        {
          "date": "2024-11-01",
          "note": "Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025005706"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site",
          "title": "Core Scientific - CoreWeave Announce 1.2B expansion in Denton, TX"
        },
        {
          "url": "https://corescientific.com/high-density-data-centers/denton-texas/",
          "title": "Core Scientific - Denton Datacenter Official Site"
        },
        {
          "url": "https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/",
          "title": "TMF - Core Scientific Q4 2025 Earnings Transcript"
        },
        {
          "url": "https://www.wsj.com/tech/ai/coreweave-stock-market-ai-bubble-a3c8c321",
          "title": "WSJ - plans to rent to OpenAI"
        }
      ]
    },
    {
      "slug": "coreweave-ellendale-nd",
      "name": "CoreWeave Ellendale ND",
      "url": "https://joltrents.com/data-centers/projects/coreweave-ellendale-nd/",
      "state": "ND",
      "state_name": "North Dakota",
      "city": "Ellendale",
      "county": "Dickey County",
      "latitude": 46.006143,
      "longitude": -98.568736,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-10-27",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-30",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 520,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 15152800000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-10-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-05-28",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-10-27",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-30",
          "note": "According to satellite imagery, Building 2 is fully roofed and shell complete, with rooftop chillers mostly installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-27",
          "note": "According to satellite imagery, Building 1 looks complete and in service, with the surrounding power/cooling equipment also operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-24",
          "note": "This Applied Digital report says the rest of Building 1 has reached Ready for Service, bringing the first building to its expected 100 MW.",
          "source": "Epoch AI, citing ir.applieddigital.com",
          "sourceUrl": "https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at"
        },
        {
          "date": "2025-10-27",
          "note": "The first 50 MW slice of Building 1 has reached Ready for Service status according to this report.",
          "source": "Epoch AI, citing ir.applieddigital.com",
          "sourceUrl": "https://ir.applieddigital.com/news-events/press-releases/detail/133/applied-digital-achieves-ready-for-service-for-phase-1-at"
        },
        {
          "date": "2025-08-29",
          "note": "A new 150 MW lease brings CoreWeave to 400 MW total contracted.",
          "source": "Epoch AI, citing ir.applieddigital.com",
          "sourceUrl": "https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with"
        },
        {
          "date": "2025-05-28",
          "note": "CoreWeave signed the first lease package for 250 MW.",
          "source": "Epoch AI, citing sec.gov",
          "sourceUrl": "https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm"
        },
        {
          "date": "2023-10-31",
          "note": "Start of construction for the first building, according to Applied Digital.",
          "source": "Epoch AI, citing ir.applieddigital.com",
          "sourceUrl": "https://ir.applieddigital.com/news-events/press-releases/detail/75/applied-digital-announces-groundbreaking-of"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with",
          "title": "Applied Digital Announces 250MW AI Data Center Lease With CoreWeave"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001641172-25-013199/form8-k.htm",
          "title": "SEC 8k Filing with Applied Digital"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1",
          "title": "Applied Digital Delivers Second Building at Polaris Forge 1"
        }
      ]
    },
    {
      "slug": "coreweave-helios",
      "name": "Coreweave Helios",
      "url": "https://joltrents.com/data-centers/projects/coreweave-helios/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Afton",
      "county": "Dickens County",
      "latitude": 33.780639,
      "longitude": -100.867099,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-08-30",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-30",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 800,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 20001696000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-05-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-08-27",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-08-30",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-30",
          "note": "Building 1 operational at full capacity.",
          "source": "Epoch AI, citing investor.galaxy.com",
          "sourceUrl": "https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx"
        },
        {
          "date": "2026-06-17",
          "note": "Building 1 appears externally complete and likely Ready for Service, with all cooling/roofing/generators in place, but we're not labeling it operational yet due to visible surrounding yard/construction work.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-04",
          "note": "Building 1 appears substantially complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-08-27",
          "note": "Backup generator pads and steel framing for chillers are visible, similar to the 3D renderings.",
          "source": "Epoch AI, citing galaxy.com",
          "sourceUrl": "https://www.galaxy.com/data-centers"
        },
        {
          "date": "2025-05-31",
          "note": "Land clearing: The former crypto mining Helios site begins converting the first building and expanding, with land cleared for additional buildings.",
          "source": "Epoch AI, citing web.archive.org",
          "sourceUrl": "https://web.archive.org/web/20250423225644/https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Commitment-with-CoreWeave-to-Host-Additional-Artificial-Intelligence-and-High-Performance-Computing-Infrastructure-at-Helios-Data-Center-Campus/default.aspx"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx",
          "title": "Galaxy Q3 financial results with power capacity timeline"
        },
        {
          "url": "https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8711478&Rendition=Web#:~:text=Galaxy%20Helios%20I%20LLC%20owns,are%20the%20basis%20of%20the",
          "title": "Permit review with details on backup generators and power capacity"
        },
        {
          "url": "https://www.galaxy.com/data-centers",
          "title": "3D renderings of Helios Building 1 on Galaxy's website, showing generators and chillers"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012175",
          "title": "TDLR record with Building 1 construction costs and end date"
        }
      ]
    },
    {
      "slug": "coreweave-lancaster-greenfield",
      "name": "CoreWeave Lancaster Greenfield site",
      "url": "https://joltrents.com/data-centers/projects/coreweave-lancaster-greenfield/",
      "state": "PA",
      "state_name": "Pennsylvania",
      "city": "Lancaster",
      "county": "Lancaster County",
      "latitude": 40.04869,
      "longitude": -76.25609,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2025-07-15",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-13",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 124,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-13",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 3485144000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-13",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-13",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2025-07-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-13",
          "note": "Cooling install continues on the roof, satellite imagery indicates that not all units have been completed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-07-15",
          "note": "Coreweave announces $6 billion investment into Lancaster data centers, at two former printing press sites.",
          "source": "Epoch AI, citing investors.coreweave.com",
          "sourceUrl": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx",
          "title": "CoreWeave announces plans to spend $6 billion on Lancaster data centers"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/machine-investment-acquires-two-printing-press-sites-in-pennsylvania-plans-data-center-redevelopment/?utm_source=datacentermap.com",
          "title": "Machine Investment Group purchases two former printing press sites in Lancaster, Pennsylvania"
        }
      ]
    },
    {
      "slug": "coreweave-marble-nc",
      "name": "CoreWeave Marble NC",
      "url": "https://joltrents.com/data-centers/projects/coreweave-marble-nc/",
      "state": "NC",
      "state_name": "North Carolina",
      "city": "Marble",
      "county": "Cherokee County",
      "latitude": 35.184987,
      "longitude": -83.914091,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-03-13",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-06",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 91,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-06",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 2462330000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-06",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-06",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2024-06-25",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-03-13",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-06",
          "note": "Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-17",
          "note": "Satellite imagery shows the main data hall and southern utility yard substantially complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-13",
          "note": "The site has been energized.",
          "source": "Epoch AI, citing sec.gov",
          "sourceUrl": "https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm"
        },
        {
          "date": "2024-06-25",
          "note": "Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-031246/q1fy26earningsdeck.htm",
          "title": "Core Scientific - Q1 2026 Fiscal Earnings Call"
        },
        {
          "url": "https://corescientific.com/high-density-data-centers/marble-nc/",
          "title": "Core Scientific - Official Marble, NC Datacenter page"
        },
        {
          "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/exhibit992-q12025earning.htm",
          "title": "Core Scientific - Q1 2025 Earnings Presentation"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm",
          "title": "Core Scientific - June 2024 Investor and Analyst Day"
        }
      ]
    },
    {
      "slug": "coreweave-muskogee-ok",
      "name": "CoreWeave Muskogee OK",
      "url": "https://joltrents.com/data-centers/projects/coreweave-muskogee-ok/",
      "state": "OK",
      "state_name": "Oklahoma",
      "city": "Muskogee",
      "county": "Muskogee County",
      "latitude": 35.696923,
      "longitude": -95.383856,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2026-04-09",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "CoreWeave",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-13",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 181,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-13",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5795946000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-13",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-13",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-11-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-04-09",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-13",
          "note": "Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-09",
          "note": "Based on satellite imagery, Building 1 looks mostly complete, but the site still appears to be in construction or commissioning.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-11-18",
          "note": "Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center.",
          "source": "Epoch AI, citing investors.corescientific.com",
          "sourceUrl": "https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center",
          "title": "Core Scientific ground breaking announcement"
        },
        {
          "url": "https://www.portmuskogee.com/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/",
          "title": "Port Muskogee ground breaking announcement"
        },
        {
          "url": "https://applications.deq.ok.gov/permitspublic/storedpermits/9138.pdf",
          "title": "Air quality permit application"
        }
      ]
    },
    {
      "slug": "crusoe-abilene-expansion",
      "name": "Crusoe Abilene Expansion",
      "url": "https://joltrents.com/data-centers/projects/crusoe-abilene-expansion/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Abilene",
      "county": "Taylor County",
      "latitude": 32.494232,
      "longitude": -99.800907,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Site work",
      "stage_date": "2025-11-02",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-01-15",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 941,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-01-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 25456704000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-01-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-01-15",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-11-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-01-15",
          "note": "Land clearing continues.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-02",
          "note": "Land clearing begins for Buildings 1-2.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.bloomberg.com/news/articles/2026-03-06/oracle-and-openai-end-plans-to-expand-flagship-data-center",
          "title": "Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them"
        },
        {
          "url": "https://www.tceq.texas.gov/assets/public/permitting/air/reports/applications/400428-ac.pdf",
          "title": "Air Permit Application for the buildings, featuring blueprints on p.391"
        },
        {
          "url": "https://www.aterio.io/blog/stargate-files-for-phase-3-expansion-in-abilene",
          "title": "Aterio"
        },
        {
          "url": "https://x.com/mustafasuleyman/status/2037547756320141587",
          "title": "Partnership Announcement with Microsoft"
        }
      ]
    },
    {
      "slug": "goodnight",
      "name": "Goodnight",
      "url": "https://joltrents.com/data-centers/projects/goodnight/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Claude",
      "county": null,
      "latitude": 35.10811,
      "longitude": -101.362741,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2025-10-16",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 1294,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-16",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 38109292000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-16",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": "Crusoe, Hoffman",
      "general_contractor_source_url": "https://epoch.ai/data/ai-data-centers",
      "general_contractor_source_date": "2026-04-16",
      "utility_or_energy_company": "Serena",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-04-16",
      "last_changed": "2026-04-16",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-05-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-10-16",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-16",
          "note": "Progress is made on all buildings, Building 1 and 2 specically have begun to install cooling structures.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-23",
          "note": "Construction on Building 1 and 2 looks about halfway to completion.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-16",
          "note": "Building 1 and 2 under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-05-19",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.co.armstrong.tx.us/upload/page/5361/Amended_Restated_Consolidated%20Second%20Property%20Tax%20Abatement%20Agreement%20%20GNDC1_ArmstrongCounty.pdf",
          "title": "Amended tax abatement agreement, with updated blueprints on p.46"
        },
        {
          "url": "https://drive.google.com/file/d/1ky5HhuhU8_JADNB2GziWa4WDRbTU4qtO/view?usp=sharing",
          "title": "Original tax abatement agreement, with original blueprints and specs on the last page"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/",
          "title": "TABS database, with \"Llano\" data centers in the city of Claude"
        },
        {
          "url": "https://www.reuters.com/business/google-invest-40-billion-new-data-centers-texas-bloomberg-news-reports-2025-11-14/",
          "title": "Press release reports Google investing in a new data center in Armstrong County"
        },
        {
          "url": "https://drive.google.com/file/d/1sI8t1MzjDTAEnn-yY4zv3SiiTCpruzSQ/view?usp=drive_link",
          "title": "Clean Air Act Initial Prevention of Significant Deterioration permit application."
        }
      ]
    },
    {
      "slug": "google-arcola",
      "name": "Google Arcola",
      "url": "https://joltrents.com/data-centers/projects/google-arcola/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Sterling",
      "county": null,
      "latitude": 39.003685,
      "longitude": -77.40831,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-06-16",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-16",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 93,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-16",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 2916914000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-16",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-16",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2024-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-06-16",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-16",
          "note": "Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-09",
          "note": "Building 1 appears almost complete, with minimal construction activity.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-08",
          "note": "Building 1 roof complete, cooling towers in progress.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-10-01",
          "note": "Building 1 foundation started.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.bisnow.com/national/news/data-center/google-investing-1b-to-improve-northern-virginia-data-centers-124025",
          "title": "Google Investing $1B To Improve Northern Virginia Data Centers (via Aterio)"
        }
      ]
    },
    {
      "slug": "google-bristow",
      "name": "Google Bristow",
      "url": "https://joltrents.com/data-centers/projects/google-bristow/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Bristow",
      "county": "Prince William County",
      "latitude": 38.782544,
      "longitude": -77.579717,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-04-29",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-20",
      "tenant": "Google DeepMind",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-05-20",
      "planned_mw": 286,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-20",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 9015916000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-20",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-20",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-07-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-04-29",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-20",
          "note": "Building 3 is operational, based off of colored motion artifacts from cooling towers.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-04-29",
          "note": "Building 2 is operational, based off it being at least 12 months since the roof was complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-29",
          "note": "Building 1 is operational, based off of colored motion artifacts from cooling towers.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-07-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://sustainability.google/reports/google-2026-environmental-report/",
          "title": "Google Environmental Report"
        }
      ]
    },
    {
      "slug": "google-cedar-rapids",
      "name": "Google Cedar Rapids",
      "url": "https://joltrents.com/data-centers/projects/google-cedar-rapids/",
      "state": "IA",
      "state_name": "Iowa",
      "city": "Cedar Rapids",
      "county": "Linn County",
      "latitude": 41.921946,
      "longitude": -91.71563,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2025-10-27",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-04-16",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 314,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-16",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 9887202000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-16",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-04-16",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-06-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-10-27",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-16",
          "note": "Building 1's generators are still only about halfway in place, and ~1/2 the cooling towers are still under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-29",
          "note": "About half of Building 1 generators are in place.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-27",
          "note": "Building 1 cooling towers and generators starting to be put in place.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-06-14",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf",
          "title": "MISO new load announcements"
        },
        {
          "url": "https://www.govonlinesaas.com/LCPH/EasyAir/Public/EnSuite/Shared/Pages/util/StreamDoc.ashx?id=260&type=attachment",
          "title": "Permit application"
        }
      ]
    },
    {
      "slug": "google-columbus",
      "name": "Google Columbus",
      "url": "https://joltrents.com/data-centers/projects/google-columbus/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "Columbus",
      "county": "Franklin County",
      "latitude": 39.861452,
      "longitude": -83.003999,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-04-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-05",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 464,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-05",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 14622452000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-05",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-05",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2023-07-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-05",
          "note": "Confirmation that Building 4 is complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-01",
          "note": "Building 4 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-21",
          "note": "Buildings 1-3 are visibly operational, with steam coming out of the cooling towers.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-01",
          "note": "Building 3 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-03-01",
          "note": "Building 2 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-01",
          "note": "Building 1 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-07-01",
          "note": "Building 2 foundation work begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-10-01",
          "note": "Land clearing begins on the eastern half of the site, for Buildings 1-2.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-columbus-ohio-data-center/",
          "title": "DCD article detailing early work beginning on the site"
        },
        {
          "url": "https://www.aeptransmission.com/ohio/docs/Hartman%20Farms%20Extension%20No.%202%20138%20kV%20Transmission%20Line%20Project%20Construction%20Notice.pdf",
          "title": "Transmission line construction notice; details current site capacity, expansion, and maximum future site capacity"
        }
      ]
    },
    {
      "slug": "google-council-bluffs-east",
      "name": "Google Council Bluffs (East)",
      "url": "https://joltrents.com/data-centers/projects/google-council-bluffs-east/",
      "state": "IA",
      "state_name": "Iowa",
      "city": "Council Bluffs",
      "county": "Pottawattamie County",
      "latitude": 41.167418,
      "longitude": -95.793108,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-11-19",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-07",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 284,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-07",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 8978034000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-07",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-07",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-09-06",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-11-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-07",
          "note": "Building 3 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-11",
          "note": "Building 3 has all 34 backup generators installed and 4 cooling towers installed, with 3 more cooling towers under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-07-19",
          "note": "Land clearing begins in the southwest, suggesting more buildings are planned.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-15",
          "note": "Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-11-19",
          "note": "Building 1 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-09-06",
          "note": "Land clearing begins for east buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://programs.iowadnr.gov/easyair/Public/EnSuite/Shared/Pages/Util/ServerRptViewer.aspx?sr=/IDNR/Reports/EASY/RPT_Construction_Application_A_GEN&SUBMISSION_RID=67330&SUB_FORM_RID=148293",
          "title": "Construction permit application form with site address"
        },
        {
          "url": "https://programs.iowadnr.gov/easyair/Public/EnSuite/Shared/Pages/Util/ServerRptViewer.aspx?sr=/IDNR/Reports/EASY/RPT_Construction_Application_E_EU&SUBMISSION_RID=67330&SUB_FORM_RID=148297",
          "title": "Construction permit application form with backup generator data"
        }
      ]
    },
    {
      "slug": "google-fort-wayne",
      "name": "Google Fort Wayne",
      "url": "https://joltrents.com/data-centers/projects/google-fort-wayne/",
      "state": "IN",
      "state_name": "Indiana",
      "city": "Fort Wayne",
      "county": "Allen County",
      "latitude": 41.031167,
      "longitude": -85.057768,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2024-09-13",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-19",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 1035,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-19",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 32692166000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-19",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-19",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2024-09-13",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-19",
          "note": "Building 2 has all cooling towers installed and is likely undergoing fit-out and commissioning.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-01",
          "note": "The cooling towers for Buildings 2 and 3 are both a little less than half done and the buildings still look like active construction sites.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-01",
          "note": "Building 2 looks externally complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-10",
          "note": "After a long quiet period they've laid foundations for Building 2 and the substation.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-09-13",
          "note": "Roof complete on Building 1, although we suspect this building is not for AI compute due to the construction speed, irregular design, and lack of external cooling.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-01",
          "note": "First signs of development/land clearing.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.thelocalfw.com/what-to-know-about-googles-plans-for-wetlands-in-fort-wayne/",
          "title": "Google's plans for wetlands in Fort Wayne"
        },
        {
          "url": "https://www.thelocalfw.com/data-center-diesel-generators/",
          "title": "Data center's diesel generators"
        },
        {
          "url": "https://www.thelocalfw.com/data-centers-secrecy-and-tax-abatements/",
          "title": "Project's history and tax abatement"
        },
        {
          "url": "https://citycouncildocuments.acfw.net/documents/download/2023-12-19/R-23-12-02.pdf",
          "title": "City Council approval"
        }
      ]
    },
    {
      "slug": "google-kansas-city-east",
      "name": "Google Kansas City East",
      "url": "https://joltrents.com/data-centers/projects/google-kansas-city-east/",
      "state": "MO",
      "state_name": "Missouri",
      "city": "Kansas City",
      "county": null,
      "latitude": 39.125155,
      "longitude": -94.550313,
      "location_precision": "city",
      "location_source_url": "https://www.datacenterdynamics.com/en/news/google-files-project-plan-for-data-center-in-kansas-city-missouri/",
      "stage": "Operating",
      "stage_date": "2026-08-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-01",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 126,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 3977610000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-01",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-12-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2024-03-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-08-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-01",
          "note": "Building 1 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-16",
          "note": "Building 1 is almost complete, with only cooling needing 4 more fans.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-01",
          "note": "Foundation work begins for Building 4.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-07-01",
          "note": "Foundation work begins for Building 3.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-10-01",
          "note": "Foundation work begins on Building 2.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-03-01",
          "note": "Foundation work begins on Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-12-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
          "title": "Hunt Midwest Business Center press release linking data center with Google"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-files-project-plan-for-data-center-in-kansas-city-missouri/",
          "title": "DCD article on the site"
        }
      ]
    },
    {
      "slug": "google-lancaster",
      "name": "Google Lancaster",
      "url": "https://joltrents.com/data-centers/projects/google-lancaster/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "Lancaster",
      "county": "Fairfield County",
      "latitude": 39.727031,
      "longitude": -82.683111,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-01-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-03-12",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 164,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-03-12",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5189834000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-03-12",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-03-12",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-01-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-03-12",
          "note": "At this point, Building 1 and 2 have since already been operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-31",
          "note": "Building 2 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-11",
          "note": "Building 2 is close to completion.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-01-01",
          "note": "Building 1 operational.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@39.72490515,-82.68845499,280.4138206a,1128.806013d,35y,-0h,0t,0r/data=CnUaXRJXCiUweDg4NDc4OWI3MDRhZGE1MWQ6MHg0Y2Q1MjE2ZGM0YTQ0YTc5GSZeVEH73ENAISDkBo2qq1TAKhwxMDQgV2hpbGV5IFJkLCBMYW5jYXN0ZXIsIE9IGAIgASoQCAESCjIwMjMtMDUtMTAYAUICCAFCAggASg0I____________ARAA"
        },
        {
          "date": "2021-10-01",
          "note": "Land clearing in progress for the site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-to-build-two-more-data-centers-in-columbus-ohio/",
          "title": "DCD article discussing the announcement of this site"
        }
      ]
    },
    {
      "slug": "google-lincoln",
      "name": "Google Lincoln",
      "url": "https://joltrents.com/data-centers/projects/google-lincoln/",
      "state": "NE",
      "state_name": "Nebraska",
      "city": "Lincoln",
      "county": "Lancaster County",
      "latitude": 40.907472,
      "longitude": -96.645783,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-05-12",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-12",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 339,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-12",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 10720606000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-12",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-12",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-06-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-10-23",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-05-12",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-12",
          "note": "Building 1 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-23",
          "note": "Building 1 looks mostly complete: the large items like generators and substation are done.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-06-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://upload.wikimedia.org/wikipedia/commons/2/25/Application_no-_NWO-2019-00110-WEH_-_USACE-p16021coll15-1525.pdf",
          "title": "Army corps land use application with a useful construction plan diagram, split across 7 phases"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/work-on-data-center-in-lincoln-nebraska-finally-starting/",
          "title": "DCD article on the start of site construction"
        },
        {
          "url": "https://lnklan.granicus.com/DocumentViewer.php?file=lnklan_bfe1e3023d49404348f26355e113cb22.pdf&view=1",
          "title": "Rezoning approval, stating 75 ft building height"
        }
      ]
    },
    {
      "slug": "google-mesa",
      "name": "Google Mesa",
      "url": "https://joltrents.com/data-centers/projects/google-mesa/",
      "state": "AZ",
      "state_name": "Arizona",
      "city": "Mesa",
      "county": "Maricopa County",
      "latitude": 33.400626,
      "longitude": -111.716487,
      "location_precision": "city",
      "location_source_url": "https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/",
      "stage": "Operating",
      "stage_date": "2025-07-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-15",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 237,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6932406000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-15",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-08-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-07-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-15",
          "note": "Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-15",
          "note": "Building 2 is close to being operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-07",
          "note": "Building 2 roof is mostly completed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-07-01",
          "note": "Building 1 is operational.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@33.35450568,-111.67805903,407.02398359a,2119.1496037d,35y,-0h,0t,0r/data=ChYqEAgBEgoyMDI1LTAzLTAyGAFCAggBQgIIAEoNCP___________wEQAA"
        },
        {
          "date": "2023-08-01",
          "note": "Land clearing begins for the entire site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/",
          "title": "DCD article on the site breaking ground"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/google-files-to-build-second-data-center-at-mesa-campus-in-arizona/",
          "title": "DCD article on announcement to build Building 2"
        }
      ]
    },
    {
      "slug": "google-midlothian",
      "name": "Google Midlothian",
      "url": "https://joltrents.com/data-centers/projects/google-midlothian/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Midlothian",
      "county": "Ellis County",
      "latitude": 32.438927,
      "longitude": -97.050799,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-04-19",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-01",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 123,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 3901846000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-01",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2024-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-04-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-01",
          "note": "Estimated full completion of the expanded row of cooling towers and backup generators for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-19",
          "note": "Building 1 is probably mostly operational despite some cooling towers yet to be installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-10-01",
          "note": "Building 1 roof is complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-04-01",
          "note": "Land clearing begins for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://ecode360.com/MI6405/laws/LF1665983.pdf",
          "title": "Site Map and Permit"
        },
        {
          "url": "https://archive-stream.granicus.com/OnDemand/_definst_/mp4:swagitVideo/midlothiantx/eefcd9e0-4c12-41ba-986a-165a20124c72.mp4/playlist.m3u8",
          "title": "City Council Presentation"
        }
      ]
    },
    {
      "slug": "google-new-albany",
      "name": "Google New Albany",
      "url": "https://joltrents.com/data-centers/projects/google-new-albany/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "New Albany",
      "county": null,
      "latitude": 40.081175,
      "longitude": -82.808786,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-04-20",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-18",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 400,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-18",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 12614706000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-18",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-18",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-03-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-04-20",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-18",
          "note": "Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-12",
          "note": "Building 5 has more cooling towers installed but not complete, and the roof is almost complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-18",
          "note": "Water vapor from cooling towers is present across Building 1-4, confirming their operation.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-14",
          "note": "Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-01",
          "note": "Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-09-13",
          "note": "Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-20",
          "note": "Building 1 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-03-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing",
          "title": "Draft basis of air permit for Google Omaha, a similar data center"
        },
        {
          "url": "https://sustainability.google/reports/google-2025-environmental-report/",
          "title": "2025 Environmental Report"
        }
      ]
    },
    {
      "slug": "google-omaha",
      "name": "Google Omaha",
      "url": "https://joltrents.com/data-centers/projects/google-omaha/",
      "state": "NE",
      "state_name": "Nebraska",
      "city": "Omaha",
      "county": "Douglas County",
      "latitude": 41.335728,
      "longitude": -96.088471,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-04-08",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-30",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 474,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 14963390000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-11-25",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-04-08",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-30",
          "note": "Building 3 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-15",
          "note": "Building 3 appears almost complete, with only minimal construction work and equipment remaining.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-21",
          "note": "Building 3 has all backup generators in place but they are still being installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-04-21",
          "note": "Confident that Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-03-16",
          "note": "Confirmation that there's no obvious construction happening for Building 2.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-11-19",
          "note": "Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-07-29",
          "note": "Building 2 has 3 cooling towers installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-08",
          "note": "Building 1 operational, based on it being 6 months after roof was complete, infrastructure looked complete for 5 months.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-11-25",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1KN7o-wQOyt1UEud8wpM8PymXJF479r0n/view?usp=sharing",
          "title": "Draft basis of air permit with details of cooling towers"
        },
        {
          "url": "https://sustainability.google/reports/google-2025-environmental-report/",
          "title": "2025 Environmental Report"
        }
      ]
    },
    {
      "slug": "google-papillion",
      "name": "Google Papillion",
      "url": "https://joltrents.com/data-centers/projects/google-papillion/",
      "state": "NE",
      "state_name": "Nebraska",
      "city": "Papillion",
      "county": null,
      "latitude": 41.154443,
      "longitude": -96.042238,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2023-01-23",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-04",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 284,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-04",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 8978034000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-04",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-04",
      "stages": [
        {
          "stage": "Site work",
          "date": "2020-03-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2022-10-16",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2023-01-23",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-04",
          "note": "Building 4 shell mostly complete, Building 5 steel framing is underway.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-03",
          "note": "Land cleared for Building 4 and 5.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-08-03",
          "note": "Building 3 looks operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-02-15",
          "note": "Building 2 assumed operational due to vapor from cooling towers.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-01-23",
          "note": "Building 1 assumed operational due to vapor from cooling towers.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-10-16",
          "note": "Building 2 under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2020-03-04",
          "note": "Land clearing begins for Building 1 of expansion.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1nONzuLnpMPST0bOINDKXmSZ0ANlynYY0/view?usp=sharing",
          "title": "Draft basis of air permit with details of cooling towers"
        },
        {
          "url": "https://sustainability.google/reports/google-2025-environmental-report/",
          "title": "2025 Environmental Report"
        }
      ]
    },
    {
      "slug": "google-pryor-north",
      "name": "Google Pryor (North)",
      "url": "https://joltrents.com/data-centers/projects/google-pryor-north/",
      "state": "OK",
      "state_name": "Oklahoma",
      "city": "Pryor",
      "county": "Mayes County",
      "latitude": 36.241172,
      "longitude": -95.330047,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-07-19",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-09-06",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 442,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-09-06",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 13940576000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-09-06",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-09-06",
      "stages": [
        {
          "stage": "Site work",
          "date": "2019-08-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-07-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-09-06",
          "note": "Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-26",
          "note": "Building 2 looks almost complete, but still appears to have three cooling towers missing.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-19",
          "note": "The new substation for Building 2 looks mostly complete, half of the cooling towers are installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-01-28",
          "note": "Building 2 is being retrofitted from a warehouse.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-07-19",
          "note": "Building 1 is operational, based on default roof-to-operational time.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2019-08-01",
          "note": "Land clearing begins for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://blog.google/inside-google/company-announcements/google-american-innovation-oklahoma/",
          "title": "Google announces expansion of Pryor facility"
        },
        {
          "url": "https://sustainability.google/reports/google-2025-environmental-report/",
          "title": "Google 2025 Environmental Report"
        },
        {
          "url": "https://techcrunch.com/2022/05/11/google-launches-a-9-exaflop-cluster-of-cloud-tpu-v4-pods-into-public-preview/",
          "title": "News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022"
        }
      ]
    },
    {
      "slug": "google-red-oak",
      "name": "Google Red Oak",
      "url": "https://joltrents.com/data-centers/projects/google-red-oak/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Red Oak",
      "county": "Ellis County",
      "latitude": 32.529976,
      "longitude": -96.799788,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-08-25",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-02-06",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 185,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-02-06",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5833828000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-02-06",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-02-06",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-04-30",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-08-25",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-02-06",
          "note": "Building 1 appears active - the surrounding land is finished including the site entrance and the parking lot.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-08-25",
          "note": "Building 1 is operational, based on a Google Earth image showing a completed building shell and equipment, and the large construction car park being emptied.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@32.53855187,-96.7936939,182.71625265a,4648.56607908d,30.00094375y,3.66969189h,0t,0r/"
        },
        {
          "date": "2023-04-30",
          "note": "First signs of development/land clearing.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.mysanantonio.com/business/article/google-texas-data-center-21236627.php",
          "title": "Media coverage confirming location, project name, investment size, and some timing"
        },
        {
          "url": "https://datacenters.google/efficiency/",
          "title": "Google PUE data listing the Red Oak site from Q1 2026"
        }
      ]
    },
    {
      "slug": "google-storey-county",
      "name": "Google Storey County",
      "url": "https://joltrents.com/data-centers/projects/google-storey-county/",
      "state": "NV",
      "state_name": "Nevada",
      "city": null,
      "county": "Storey County",
      "latitude": 39.438385,
      "longitude": -119.524646,
      "location_precision": "county",
      "location_source_url": "https://datacenters.google/locations/storey-county-nevada/",
      "stage": "Operating",
      "stage_date": "2023-08-30",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-04-13",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 389,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-13",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 11364600000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-13",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-04-13",
      "stages": [
        {
          "stage": "Site work",
          "date": "2019-03-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2023-08-30",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-13",
          "note": "Building 3 has a partially complete shell, electrical and mechanical equipment.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-28",
          "note": "Building 3 foundation is underway.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-30",
          "note": "Building 2 is operational.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@39.49733738,-119.43113543,1552.05877612a,1467.7067385d,35y,0h,0t,0r/"
        },
        {
          "date": "2025-03-11",
          "note": "Building 2 now has generators in place, but there is still a crane and construction work present.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-08-30",
          "note": "Building 1, which was first operational in 2021, has increased power capacity by about 75%.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@39.4948785,-119.43174359,1568.8659293a,562.69639351d,35y,-0h,0t,0r/"
        },
        {
          "date": "2019-03-18",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://ndep-onbase.nv.gov/api/Document/AeFo%C3%89pjclbkomJ7CWpPryLOjA6FQT9HFrkSuMWbMXTpKCzSR%C3%81W1f8zzFhGhik1iZCcNSpuTRRqNXD1inrrpBxtA%3D/",
          "title": "Air quality permit application listing emergency generators and a small \"R&D\" fuel cell plant"
        },
        {
          "url": "https://www.aterio.io/",
          "title": "Aterio"
        },
        {
          "url": "https://datacenters.google/locations/storey-county-nevada/",
          "title": "Google data center page"
        }
      ]
    },
    {
      "slug": "google-the-dalles",
      "name": "Google The Dalles",
      "url": "https://joltrents.com/data-centers/projects/google-the-dalles/",
      "state": "OR",
      "state_name": "Oregon",
      "city": "The Dalles",
      "county": "Wasco County",
      "latitude": 45.625389,
      "longitude": -121.202389,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-03-07",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Google",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-04-29",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 185,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-29",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5833828000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-29",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-04-29",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-03-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-03-07",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-29",
          "note": "Building 2 is estimated to be operational, based on all external equipment being installed, and ordinary cars parked by the building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-03-07",
          "note": "Building 1 is estimated to be operational, based on all external equipment being installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-03-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://static1.squarespace.com/static/5e9a1686f716835e61268f2a/t/63659cb153e00407c9cd0bc9/1667603634454/SPR%2B512-22%2C%2BNOD%2C%2B10-31-22%2B%281%29.pdf",
          "title": "Permit confirming this is a data center and the internal square footage"
        },
        {
          "url": "https://datacenters.google/efficiency/",
          "title": "Google PUE data listing the \"3rd facility\" from Q3 2025"
        }
      ]
    },
    {
      "slug": "meta-aiken",
      "name": "Meta Aiken",
      "url": "https://joltrents.com/data-centers/projects/meta-aiken/",
      "state": "SC",
      "state_name": "South Carolina",
      "city": "Trenton",
      "county": null,
      "latitude": 33.741656,
      "longitude": -81.842339,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-08-07",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-11-05",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-11-05",
      "planned_mw": 168,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-11-05",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 4886778000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-11-05",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-11-05",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-05-30",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-04-08",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-08-07",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-11-05",
          "note": "Building 2 is operational assuming a 3 month lag compared to Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-08-07",
          "note": "Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-08",
          "note": "Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-05-30",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/2024/08/hello-south-carolina/",
          "title": "Meta Introduction to the Aiken Project"
        },
        {
          "url": "https://www.dpr.com/projects/meta-aiken-data-center-aiken-sc",
          "title": "DPR Construction project page"
        }
      ]
    },
    {
      "slug": "meta-bowling-green",
      "name": "Meta Bowling Green",
      "url": "https://joltrents.com/data-centers/projects/meta-bowling-green/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "Bowling Green",
      "county": "Wood County",
      "latitude": 41.458267,
      "longitude": -83.636217,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2026-02-14",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-30",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-07-30",
      "planned_mw": 570,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 15986204000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Williams",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-07-30",
      "last_changed": "2026-07-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-11-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-02-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-30",
          "note": "Roofs of Buildings 1 and 2 are more than halfway complete.",
          "source": "Epoch AI, citing archive.ph",
          "sourceUrl": "https://archive.ph/lqgZw"
        },
        {
          "date": "2026-02-14",
          "note": "Buildings 1 and 2 under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-11-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/drive/folders/12Cz7AlZt4fJfWevNAWTfq8IyLfNHpajz",
          "title": "Meta letter to Middleton Township"
        },
        {
          "url": "https://drive.google.com/file/d/1YBuaFsslxCAZxlJtSI0rXfNsFqddwaHN/view?usp=sharing",
          "title": "Construction notice for new transmission lines to data center substation"
        },
        {
          "url": "https://archive.ph/lqgZw",
          "title": "Ohio Power Siting Board announcement"
        },
        {
          "url": "https://drive.google.com/file/d/1L154XKyiHqRzeZj36zqMRkjdG7QIFL41/view?usp=drive_link",
          "title": "Apollo Power Generation Project Letter of Notice Appendix A, with a project timeline"
        }
      ]
    },
    {
      "slug": "meta-cheyenne",
      "name": "Meta Cheyenne",
      "url": "https://joltrents.com/data-centers/projects/meta-cheyenne/",
      "state": "WY",
      "state_name": "Wyoming",
      "city": "Cheyenne",
      "county": "Laramie County",
      "latitude": 41.139981,
      "longitude": -104.820246,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-07-25",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-25",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-07-25",
      "planned_mw": 249,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-25",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 7841574000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-25",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-25",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-05-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-01-30",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-07-25",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-25",
          "note": "Both buildings estimated to be operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-22",
          "note": "Building 1 shell and cooling looks complete, Building 2 roof almost complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-01-30",
          "note": "Structure for Building 1 and 2 under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-05-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/",
          "title": "Meta Introduction to the Cheyenne Project"
        },
        {
          "url": "https://fortisconstruction.com/news/fortis-building-metas-cheyenne-campus/",
          "title": "Fortis Construction announcement"
        },
        {
          "url": "https://cheyenneleads.org/meta-announces-new-data-center-a-major-investment-in-cheyenne-wyoming/",
          "title": "Press announcement suggesting a 2027 operational date"
        }
      ]
    },
    {
      "slug": "meta-eagle-mountain",
      "name": "Meta Eagle Mountain",
      "url": "https://joltrents.com/data-centers/projects/meta-eagle-mountain/",
      "state": "UT",
      "state_name": "Utah",
      "city": "Eagle Mountain",
      "county": null,
      "latitude": 40.309349,
      "longitude": -112.011982,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-12-07",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-02",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-05-02",
      "planned_mw": 179,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-02",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5038306000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-02",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": "Mortenson",
      "general_contractor_source_url": "https://epoch.ai/data/ai-data-centers",
      "general_contractor_source_date": "2026-05-02",
      "utility_or_energy_company": "Williams",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-05-02",
      "last_changed": "2026-05-02",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-08-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-09-08",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-12-07",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-02",
          "note": "Satellite image shows strong evidence that Buildings 1 and 2 are operational: colored motion artifacts on many cooling fans, plus cars parked at the building entrances.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-07",
          "note": "Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-08",
          "note": "Buildings 1 and 2 are still undergoing testing due to construction equipment and unfinished land surrounding the data center sites, as well as color motion artifacts on a small number of the cooling fans.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-08-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.facebook.com/EagleMountainDataCenter/posts/517902967007646",
          "title": "Expansion announcement by Meta"
        },
        {
          "url": "https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026.02.05_Eagle%20Mountain%20Power%20Plant_Application_32a5238b.pdf",
          "title": "Report on Williams Company gas-fired plant under construction adjacent to data cente"
        }
      ]
    },
    {
      "slug": "meta-gallatin",
      "name": "Meta Gallatin",
      "url": "https://joltrents.com/data-centers/projects/meta-gallatin/",
      "state": "TN",
      "state_name": "Tennessee",
      "city": "Gallatin",
      "county": null,
      "latitude": 36.388303,
      "longitude": -86.44759,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-08-24",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-24",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-08-24",
      "planned_mw": 114,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-24",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 3295734000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-24",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-24",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-09-11",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-02-09",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-08-24",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-24",
          "note": "Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-09",
          "note": "Building 1 shell and cooling looks complete, but construction equipment is still seen around cooling and building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-09-11",
          "note": "Land clearing starts for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Gallatin-Data-Center.pdf",
          "title": "Meta fact sheet"
        },
        {
          "url": "https://www.gallatingetsit.com/newsroom/meta-approved-for-another-data-center-on-gallatin-campus",
          "title": "Campus extension announcement"
        }
      ]
    },
    {
      "slug": "meta-huntsville",
      "name": "Meta Huntsville",
      "url": "https://joltrents.com/data-centers/projects/meta-huntsville/",
      "state": "AL",
      "state_name": "Alabama",
      "city": "Toney",
      "county": null,
      "latitude": 34.898144,
      "longitude": -86.73357,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-03-04",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-02",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-02",
      "planned_mw": 198,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-02",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5530772000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-02",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Tennessee Valley Authority, NextEra Energy Resources, First Solar",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-06-02",
      "last_changed": "2026-06-02",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-12-13",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-03-03",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-03-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-02",
          "note": "Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-04",
          "note": "Building 1 is operational 30 days after the appearance of color artifacts on the fans.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-02",
          "note": "Color artifacts appear on small number of Building 1 fans.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-04",
          "note": "Building 1 and 2 are still being finished due to continued construction vehicles and unfinished land around the data center sites.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-03-03",
          "note": "Building 2 roof starts to go on and its cooling installation is in progress.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-12-13",
          "note": "Building 1 land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://plateauexcavation.com/projects/huntsville-meta-data-center-meta-project-ferris/",
          "title": "Announcement of expansion completing in 2026"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/tva-announces-largest-valley-solar-installations--built-for-facebook-300743255.html",
          "title": "TVA solar installation announcements"
        }
      ]
    },
    {
      "slug": "meta-hyperion",
      "name": "Meta Hyperion",
      "url": "https://joltrents.com/data-centers/projects/meta-hyperion/",
      "state": "LA",
      "state_name": "Louisiana",
      "city": "Holly Ridge",
      "county": "Richland Parish",
      "latitude": 32.467642,
      "longitude": -91.626788,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2025-10-19",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-04-19",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-04-19",
      "planned_mw": 2203,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-19",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 61823424000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-19",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": "Mortenson",
      "general_contractor_source_url": "https://epoch.ai/data/ai-data-centers",
      "general_contractor_source_date": "2026-04-19",
      "utility_or_energy_company": "Entergy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-04-19",
      "last_changed": "2026-04-19",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-12-20",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-10-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-19",
          "note": "Building 1 and 2 roof is finished and cooling is at an advanced stage of installation.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-19",
          "note": "Foundations are underway for the main buildings, and the overall layout aligns with the architectural renderings published in 2025.",
          "source": "Epoch AI, citing engineering.fb.com",
          "sourceUrl": "https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/"
        },
        {
          "date": "2024-12-20",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/richland-parish-data-center/",
          "title": "Data center profile by Meta"
        },
        {
          "url": "https://drive.google.com/file/d/1FLY13apaHy4hI8RNVk9n_nlJpwFHtBrB/view?usp=sharing",
          "title": "Entergy's application for generation and transmission resources"
        },
        {
          "url": "https://drive.google.com/file/d/1D4eUHwEuirNi0g3IU_xGOti3PcC8fcXi/view?usp=sharing",
          "title": "MISO update with 1.8 GW substation plan"
        },
        {
          "url": "https://www.spglobal.com/ratings/en/regulatory/article/-/view/sourceId/101653176",
          "title": "S&P Global ratings research with 2.064 GW campus details"
        }
      ]
    },
    {
      "slug": "meta-jeffersonville",
      "name": "Meta Jeffersonville",
      "url": "https://joltrents.com/data-centers/projects/meta-jeffersonville/",
      "state": "IN",
      "state_name": "Indiana",
      "city": "Jeffersonville",
      "county": "Clark County",
      "latitude": 38.279118,
      "longitude": -85.739097,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-06-04",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-04",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-04",
      "planned_mw": 241,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-04",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6742996000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-04",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-04",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-02-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-03-06",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-06-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-04",
          "note": "Building 1 and 2 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-06",
          "note": "Building 1 and 2 shell and cooling look complete, but there's still construction activity.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-02-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Jeffersonville-Data-Center.pdf",
          "title": "Official Meta Fact Sheet"
        },
        {
          "url": "https://www.turnerconstruction.com/insights/turner-construction-company-to-build-hyperscale-data-center-for-meta-in-indiana",
          "title": "Turner Construction contractor presenting their involvement in the project."
        },
        {
          "url": "https://drive.google.com/file/d/1RpOCS_z32qaWskhhAJL8_QjU9VSz5Eqh/view?usp=sharing",
          "title": "Air Quality Permit for initial buildout"
        }
      ]
    },
    {
      "slug": "meta-kuna",
      "name": "Meta Kuna",
      "url": "https://joltrents.com/data-centers/projects/meta-kuna/",
      "state": "ID",
      "state_name": "Idaho",
      "city": "Kuna",
      "county": "Ada County",
      "latitude": 43.459233,
      "longitude": -116.421077,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-06-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-01",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-01",
      "planned_mw": 198,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 5758064000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Idaho Power Company",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-06-01",
      "last_changed": "2026-06-01",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-07-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-03-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-06-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-01",
          "note": "Building 1 and 2 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-15",
          "note": "Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-07-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Kuna-Data-Center.pdf",
          "title": "Official Pamphlet from Meta"
        },
        {
          "url": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2229/CaseFiles/20221114Application.pdf",
          "title": "Application for Power Purchase Agreement, Pleasant Valley Solar 1"
        },
        {
          "url": "https://lf-puc.idaho.gov/WebLink/DocView.aspx?dbid=0&id=73294",
          "title": "Application for Power Purchase Agreement, Pleasant Valley Solar 2"
        },
        {
          "url": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2420/OrdNotc/20240913Final_Order_No_36322.pdf",
          "title": "Approval to move start date of Solar 2 to May 31, 2026"
        },
        {
          "url": "https://lf-puc.idaho.gov/WebLink/DocView.aspx?dbid=0&id=135751",
          "title": "staff comments"
        },
        {
          "url": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2442/OrdNotc/20241210Notice_of_Application_Order_No_36419.pdf",
          "title": "Notice of Application for 3rd PPA (Blacks Creek Energy Center)"
        },
        {
          "url": "https://www.idahostatesman.com/news/business/article304464416.html",
          "title": "Idaho Statesman: Peak construction reached in March 2025"
        },
        {
          "url": "https://www.idahostatesman.com/opinion/from-the-opinion-editor/article259250030.html",
          "title": "Idaho Statesman: Expected water usage reported in 2022"
        }
      ]
    },
    {
      "slug": "meta-los-lunas",
      "name": "Meta Los Lunas",
      "url": "https://joltrents.com/data-centers/projects/meta-los-lunas/",
      "state": "NM",
      "state_name": "New Mexico",
      "city": "Los Lunas",
      "county": "Valencia County",
      "latitude": 34.830165,
      "longitude": -106.783827,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-03-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-10-26",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-10-26",
      "planned_mw": 273,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-10-26",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 8258276000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-10-26",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-10-26",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-07-24",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-03-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-10-26",
          "note": "Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-07-28",
          "note": "Building 2 shell is complete, but we don't believe it's operational because there is unpaved ground, no cars parked right in front, the first tent buildings at Meta Prometheus took about 16 months.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-01",
          "note": "Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-07-24",
          "note": "Land clearing starts for new building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf",
          "title": "Meta fact sheet"
        },
        {
          "url": "https://drive.google.com/file/d/1TxuazhSkiaHCd5FGKh_Syc_RsrzfV7Wd/view?usp=drive_link",
          "title": "Air quality permit for expansion"
        },
        {
          "url": "https://fortisconstruction.com/project/meta-los-lunas-campus/",
          "title": "Construction contractor page for the site"
        }
      ]
    },
    {
      "slug": "meta-montgomery",
      "name": "Meta Montgomery",
      "url": "https://joltrents.com/data-centers/projects/meta-montgomery/",
      "state": "AL",
      "state_name": "Alabama",
      "city": "Montgomery",
      "county": "Montgomery County",
      "latitude": 32.264997,
      "longitude": -86.363512,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-06-18",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-18",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-18",
      "planned_mw": 465,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-18",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 13561756000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-18",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": "Hensel Phelps",
      "general_contractor_source_url": "https://epoch.ai/data/ai-data-centers",
      "general_contractor_source_date": "2026-06-18",
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-18",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-03-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-07-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-06-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-18",
          "note": "Buildings 1 and 2 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-20",
          "note": "Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site and few cars in the front carpark, so we expect 3 more months needed for commissioning and server installation.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-07-04",
          "note": "Building 1 and 2 under construction, with all chillers visible.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-03-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/2024/05/hello-montgomery/",
          "title": "Meta Introduction to the Montgomery Project"
        },
        {
          "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
          "title": "Meta expansion announcement"
        },
        {
          "url": "https://www.henselphelps.com/meta-awards-hensel-phelps-montgomery-data-center/",
          "title": "Contractor announcement"
        }
      ]
    },
    {
      "slug": "meta-prometheus",
      "name": "Meta Prometheus",
      "url": "https://joltrents.com/data-centers/projects/meta-prometheus/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "New Albany",
      "county": null,
      "latitude": 40.081175,
      "longitude": -82.808786,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-10-14",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-31",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-08-31",
      "planned_mw": 1328,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-31",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 38715404000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-31",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Williams, American Electric Power",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-08-31",
      "last_changed": "2026-08-31",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-04-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-06-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-10-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-31",
          "note": "Buildings 7-10 are operational, based on infrared drone video from RAAD captured on this date.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-18",
          "note": "Building 7-11 look structurally complete but not operational, given there is still construction activity, including at the adjacent Socrates South power plant.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-12",
          "note": "The Socrates South power plant to the right of Buildings 7-12 now has 10 natural gas turbines in place, judging by the number of exhaust stacks.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-18",
          "note": "Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-14",
          "note": "Building 1 is operational, based on there being minimal construction work and cars in the main carpark.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-20",
          "note": "Building 4 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-06-01",
          "note": "Roof complete on Building 5.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-04-14",
          "note": "Land clearing begins for Building 1-2.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/",
          "title": "Meta blog post with details on Prometheus"
        },
        {
          "url": "https://drive.google.com/file/d/1Wb_BBVOnhu5UCQ8Q5d6iRIG9K_vigD8A/view?usp=sharing",
          "title": "New Albany Business Park land use map"
        },
        {
          "url": "https://drive.google.com/file/d/1OMbFbdNGPmfSkwVWqOAK-5pOufiKQBu1/view?usp=sharing",
          "title": "Letter on Socrates South Power Generation Project"
        }
      ]
    },
    {
      "slug": "meta-rosemount",
      "name": "Meta Rosemount",
      "url": "https://joltrents.com/data-centers/projects/meta-rosemount/",
      "state": "MN",
      "state_name": "Minnesota",
      "city": "Rosemount",
      "county": "Dakota County",
      "latitude": 44.73882,
      "longitude": -93.057005,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-06-19",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-19",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-19",
      "planned_mw": 241,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-19",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6742996000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-19",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-19",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-02-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-03-21",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-06-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-19",
          "note": "Buildings 1 and 2 are estimated to be operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-03-21",
          "note": "Both buildings and their cooling infrastructure look complete, but the site probably is likely still under commissioning, and few cars are parked to the right of Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-02-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/2024/03/hello-rosemount/",
          "title": "Official Meta announcement."
        },
        {
          "url": "https://drive.google.com/file/d/1i2D0eMp9uc1CfRhymu69Bms5wz9q0Rkc/view?usp=sharing",
          "title": "Air quality permit for initial buildout."
        }
      ]
    },
    {
      "slug": "meta-sarpy",
      "name": "Meta Sarpy",
      "url": "https://joltrents.com/data-centers/projects/meta-sarpy/",
      "state": "NE",
      "state_name": "Nebraska",
      "city": "Springfield",
      "county": "Sarpy County",
      "latitude": 41.103572,
      "longitude": -96.147913,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-08-02",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-08-02",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-08-02",
      "planned_mw": 105,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-08-02",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 3030560000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-08-02",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-08-02",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-08-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-05-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-08-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-08-02",
          "note": "Building 1 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-04",
          "note": "Building 1 shell, electrical and cooling equipment looks complete, with minimal construction work, so we expect it to be operational within 3 months.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-08-01",
          "note": "Building 1 grading underway.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/",
          "title": "Meta Sarpy info sheet (PDF)"
        }
      ]
    },
    {
      "slug": "meta-temple",
      "name": "Meta Temple",
      "url": "https://joltrents.com/data-centers/projects/meta-temple/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Temple",
      "county": "Bell County",
      "latitude": 31.126017,
      "longitude": -97.36,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-12-09",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Meta",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-09-30",
      "tenant": "Meta",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-09-30",
      "planned_mw": 231,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-09-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6742996000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-09-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": "JE Dunn",
      "general_contractor_source_url": "https://epoch.ai/data/ai-data-centers",
      "general_contractor_source_date": "2026-09-30",
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-09-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2023-02-05",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-12-09",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-09-30",
          "note": "Building 3 is operational.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019"
        },
        {
          "date": "2026-02-24",
          "note": "Building 3 is under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-09",
          "note": "Building 1 and 2 are operational.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728"
        },
        {
          "date": "2025-11-15",
          "note": "Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-04-01",
          "note": "The traditional Meta data center has been demolished mid-construction, in favor of Meta's new AI-optimized design.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-02-05",
          "note": "A traditional H-shaped Meta data center is partially built.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-04-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://jedunn.com/projects/meta-temple-data-center/",
          "title": "JE Dunn project page"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728",
          "title": "TDLR filing"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019",
          "title": "TDLR filing"
        }
      ]
    },
    {
      "slug": "meta-qts-hillsboro-2",
      "name": "Meta-QTS Hillsboro 2",
      "url": "https://joltrents.com/data-centers/projects/meta-qts-hillsboro-2/",
      "state": "OR",
      "state_name": "Oregon",
      "city": "Hillsboro",
      "county": "Washington County",
      "latitude": 45.556953,
      "longitude": -122.931942,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2023-08-02",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 243,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-17",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6818760000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-17",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Portland General Electric, Avangrid",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-04-17",
      "last_changed": "2026-04-17",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2023-04-29",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2023-08-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-17",
          "note": "All four buildings are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-04-14",
          "note": "All four buildings are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-11-08",
          "note": "Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-08-02",
          "note": "Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-04-29",
          "note": "Satellite imagery shows Building 3 and 4 cooling start to go on.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-04-01",
          "note": "First signs of site land clearing appear on satellite imagery.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://q.com/data-centers/hillsboro-2/",
          "title": "QTS Hillsboro 2 data center announcement"
        },
        {
          "url": "https://q.com/news/avangrid-and-portland-general-electric-collaborate-with-qts-and-meta-to-build-120-mwac-solar-project-in-oregon/",
          "title": "QTS and Meta sign an agreement with PGE for a 120MWac solar installation"
        }
      ]
    },
    {
      "slug": "microsoft-fairwater-atlanta",
      "name": "Microsoft Fairwater Atlanta",
      "url": "https://joltrents.com/data-centers/projects/microsoft-fairwater-atlanta/",
      "state": "GA",
      "state_name": "Georgia",
      "city": "Fayetteville",
      "county": "Fayette County",
      "latitude": 33.445341,
      "longitude": -84.525447,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-10-14",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-14",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 859,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-14",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 24092952000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-14",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Georgia Power",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-06-14",
      "last_changed": "2026-06-14",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-04-09",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-10-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-14",
          "note": "Building 3 and 4 are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-15",
          "note": "Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-13",
          "note": "Building 4 roof is complete and all mechanical equipment appears to be installed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-14",
          "note": "Building 1 and 2 are operational.",
          "source": "Epoch AI, citing news.microsoft.com",
          "sourceUrl": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/"
        },
        {
          "date": "2023-04-09",
          "note": "Land clearing begins for southern part.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1p7aY9syz319IcEuyukgIIvzmhTNKRS6p/view?usp=sharing",
          "title": "2023 Air Permit application"
        },
        {
          "url": "https://www.youtube.com/watch?v=44eWesI-174",
          "title": "YouTube video with aerial views"
        },
        {
          "url": "https://openai.com/index/mrc-supercomputer-networking/",
          "title": "OpenAI article mentioning they use Microsoft's Fairwater supercomputers"
        },
        {
          "url": "https://www.bloomberg.com/news/features/2024-12-08/georgia-s-blackstone-backed-qts-data-center-hits-resistance-over-ai-power-needs",
          "title": "Bloomberg article"
        }
      ]
    },
    {
      "slug": "microsoft-fairwater-wisconsin",
      "name": "Microsoft Fairwater Wisconsin",
      "url": "https://joltrents.com/data-centers/projects/microsoft-fairwater-wisconsin/",
      "state": "WI",
      "state_name": "Wisconsin",
      "city": "Mount Pleasant",
      "county": "Racine County",
      "latitude": 42.674891,
      "longitude": -87.894854,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-04-16",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-05-15",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 2715,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 85726966000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "WE Energies",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-05-15",
      "last_changed": "2026-05-15",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-07-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-09-26",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-04-16",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-15",
          "note": "The main shell of Building 2 looks almost completed.",
          "source": "Epoch AI, citing mtpleasantwi.gov",
          "sourceUrl": "https://www.mtpleasantwi.gov/AgendaCenter/ViewFile/Agenda/_01212026-1292"
        },
        {
          "date": "2026-04-16",
          "note": "Building 1 is operational.",
          "source": "Epoch AI, citing x.com",
          "sourceUrl": "https://x.com/satyanadella/status/2044767391293509761?s=61"
        },
        {
          "date": "2026-01-28",
          "note": "Building 1 looks complete, but based on Microsoft announcements, it's not fully operational yet.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-26",
          "note": "Building 1 cooling and backup generators all look complete from above but there is still construction visible around the building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-07-14",
          "note": "Land clearing begins for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/",
          "title": "Microsoft blog with engineering details"
        },
        {
          "url": "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/",
          "title": "Microsoft blog with more general information"
        },
        {
          "url": "https://drive.google.com/file/d/1azyXnreQBuYEqX2oaSUgePDGCMneez5Z/view?usp=sharing",
          "title": "Construction Permit Application for building 1"
        },
        {
          "url": "https://drive.google.com/file/d/1PQKzfauDNzabN7oNviMKTvsZmxlsUVpG/view?usp=sharing",
          "title": "Plan for 9-building and 6-building expansions"
        },
        {
          "url": "https://openai.com/index/mrc-supercomputer-networking/",
          "title": "OpenAI article mentioning they use Microsoft's Fairwater supercomputers"
        }
      ]
    },
    {
      "slug": "microsoft-goodyear",
      "name": "Microsoft Goodyear",
      "url": "https://joltrents.com/data-centers/projects/microsoft-goodyear/",
      "state": "AZ",
      "state_name": "Arizona",
      "city": "Goodyear",
      "county": "Maricopa County",
      "latitude": 33.408991,
      "longitude": -112.3648,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2023-04-24",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-04-27",
      "tenant": "Microsoft",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-04-27",
      "planned_mw": 263,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-04-27",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 7652164000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-04-27",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-04-27",
      "stages": [
        {
          "stage": "Site work",
          "date": "2021-06-21",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2023-04-24",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-04-27",
          "note": "Foundations appear to be underway for Building 5 and 6, just north of Building 4.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-12",
          "note": "Confirmation that Building 3 and 4 look complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-01",
          "note": "Building 3 and 4 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-01-16",
          "note": "Building 2 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-04-24",
          "note": "Building 1 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-06-21",
          "note": "Land clearing begins for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://gis.maricopa.gov/aqd/recordsviewer/#",
          "title": "Maricopa County map"
        },
        {
          "url": "https://edms.maricopa.gov/aq/api/Document/AQizTh7Ek3Odb1UYnAFQc%C3%81Z0k59aCsu4%C3%890gw6xcPqnhTfYtG7scD%C3%89BewWyX4qdzXFk%C3%81xL9%C3%89VthN71ODAxZuKKeU%3D/",
          "title": "Dust control permit"
        },
        {
          "url": "https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed",
          "title": "SemiAnalysis article"
        }
      ]
    },
    {
      "slug": "microsoft-project-osmium",
      "name": "Microsoft Project Osmium",
      "url": "https://joltrents.com/data-centers/projects/microsoft-project-osmium/",
      "state": "IA",
      "state_name": "Iowa",
      "city": "Cumming",
      "county": null,
      "latitude": 41.483324,
      "longitude": -93.762444,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2021-01-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-16",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 228,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-16",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 7197580000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-16",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-06-16",
      "stages": [
        {
          "stage": "Site work",
          "date": "2018-12-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2021-01-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-16",
          "note": "No notable changes since October.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-08",
          "note": "Site already complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-03-01",
          "note": "Building 3-4 operational, no visible construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-06-30",
          "note": "Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2021-01-01",
          "note": "Building 1 and 1st building on the site are operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2018-12-18",
          "note": "Land clearing begins on the north part of the site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed",
          "title": "SemiAnalysis article with IT power estimations and detailing usage by OpenAI for training GPT 3.5"
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/microsoft-granted-permit-for-new-data-center-in-des-moines-iowa/",
          "title": "DCD Article on site expansion"
        },
        {
          "url": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf",
          "title": "MISO Announcement reporting power for newest buildings, likely an overestimate"
        },
        {
          "url": "https://news.microsoft.com/source/features/ai/west-des-moines-iowa-ai-supercomputer/?msockid=23bbdd21a02166402e27c929a1a567ce",
          "title": "Microsoft article on data centers in Iowa used by OpenAI"
        }
      ]
    },
    {
      "slug": "microsoft-sat14",
      "name": "Microsoft SAT14",
      "url": "https://joltrents.com/data-centers/projects/microsoft-sat14/",
      "state": "TX",
      "state_name": "Texas",
      "city": "San Antonio",
      "county": "Bexar County",
      "latitude": 29.473182,
      "longitude": -98.681509,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-07-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-03-31",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 66,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-03-31",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 1780454000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-03-31",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-03-31",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-02-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-07-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-03-31",
          "note": "Building 2 fully operational, Building 1 expanded.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471"
        },
        {
          "date": "2026-02-28",
          "note": "No more visible construction around either building, just a little equipment.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-08-03",
          "note": "Building 2 chiller installation is a little more than halfway complete, and chiller installation for the last data hall of Building 1 is also around halfway complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-07-01",
          "note": "Building 1 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-02-18",
          "note": "Land clearing for the site is almost complete.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@29.476115,-98.68118,277.21295794a,724.52967601d,35y,0h,0t,0r/"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142",
          "title": "Phase 1 TDLR"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471",
          "title": "Phase 2 TDLR"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588",
          "title": "Phase 3 TDLR"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019686",
          "title": "Phase 4 TDLR"
        }
      ]
    },
    {
      "slug": "microsoft-sat40",
      "name": "Microsoft SAT40",
      "url": "https://joltrents.com/data-centers/projects/microsoft-sat40/",
      "state": "TX",
      "state_name": "Texas",
      "city": "San Antonio",
      "county": null,
      "latitude": 29.4246,
      "longitude": -98.49514,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-05-24",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Microsoft",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-02-04",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 106,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-02-04",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 2841150000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-02-04",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-02-04",
      "stages": [
        {
          "stage": "Site work",
          "date": "2018-12-28",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-05-24",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-02-04",
          "note": "Site has already been completed, with no more visible construction on any building.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-01",
          "note": "Building 2 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-05-24",
          "note": "Building 1 operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2018-12-28",
          "note": "Land clearing begins for the site, specifically digging up a parking lot and making outlines for the buildings.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@29.4149522,-98.80304495,292.48816289a,1532.49619452d,35y,0h,0t,0r/"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247",
          "title": "TDLR for SAT40 (Building 2)"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/EABPRJB8824650",
          "title": "TDLR for a set of three long buildings, which includes the first building we believe is for AI (Building 1)"
        }
      ]
    },
    {
      "slug": "microsoft-nebius-new-jersey",
      "name": "Microsoft-Nebius New Jersey",
      "url": "https://joltrents.com/data-centers/projects/microsoft-nebius-new-jersey/",
      "state": "NJ",
      "state_name": "New Jersey",
      "city": "Vineland",
      "county": "Cumberland County",
      "latitude": 39.428193,
      "longitude": -75.018457,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-04-15",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Nebius",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-12",
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 70,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-12",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 1894100000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-12",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-12",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-05-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-12-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-04-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-12",
          "note": "Compared with the April 2026 image, the building shell is closer to completion, and several additional air-cooled chillers have appeared on the ground, though they do not yet appear to be connected or operating.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-15",
          "note": "High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase.",
          "source": "Epoch AI, citing newsletter.semianalysis.com",
          "sourceUrl": "https://newsletter.semianalysis.com/p/stop-saying-half-of-2026-us-datacenter"
        },
        {
          "date": "2025-12-15",
          "note": "By mid-December 2025 the building was still not complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-05-31",
          "note": "Land clearing begins for northern two buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey",
          "title": "Nebius: up to 300 MW capacity at new New Jersey data center"
        },
        {
          "url": "https://datacentremagazine.com/articles/dataone-and-nebius-partner-for-new-300mw-ai-data-centre",
          "title": "DataOne and Nebius partner for 300 MW AI data center (Data Centre Magazine)"
        },
        {
          "url": "https://www.tomshardware.com/tech-industry/artificial-intelligence/microsoft-inks-usd33-billion-in-deals-with-neoclouds-like-nebius-coreweave-nebius-deal-alone-secures-100-000-nvidia-gb300-chips-for-internal-use",
          "title": "Microsoft secures 100,000 NVIDIA GB300 via Nebius deal (Tom's Hardware)"
        },
        {
          "url": "https://www.linkedin.com/feed/update/urn:li:activity:7367650153555591168/",
          "title": "DataOne CEO on first 50 MW delivery to Nebius (LinkedIn)"
        },
        {
          "url": "https://capemaycountyherald.com/article/large-data-center-nears-completion-in-vineland/",
          "title": "Large data center nears completion in Vineland (Cape May County Herald)"
        },
        {
          "url": "https://newsletter.semianalysis.com/p/stop-saying-half-of-2026-us-datacenter",
          "title": "SemiAnalysis: Stop Saying Half of 2026 US Datacenter Capacity Is Canceled"
        }
      ]
    },
    {
      "slug": "openai-stargate-abilene",
      "name": "OpenAI Stargate Abilene",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-abilene/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Abilene",
      "county": "Taylor County",
      "latitude": 32.494232,
      "longitude": -99.800907,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-09-26",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Oracle",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-11-01",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-11-01",
      "planned_mw": 1154,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-11-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 31214768000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-11-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": "Mortenson",
      "general_contractor_source_url": "https://epoch.ai/data/ai-data-centers",
      "general_contractor_source_date": "2026-11-01",
      "utility_or_energy_company": "American Electric Power",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-11-01",
      "last_changed": "2026-11-01",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-05-31",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-06-28",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-09-26",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-11-01",
          "note": "Buildings 7-8 are estimated to be operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-09-10",
          "note": "Buildings 5-6 are operational.",
          "source": "Epoch AI, citing fool.com",
          "sourceUrl": "https://www.fool.com/earnings/call-transcripts/2026/09/11/oracle-orcl-q1-2027-earnings-call-transcript/"
        },
        {
          "date": "2026-07-28",
          "note": "Buildings 5-8 are structurally complete and roofed but not yet confirmed operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-23",
          "note": "Buildings 3 and 4 are estimated to be operational.",
          "source": "Epoch AI, citing x.com",
          "sourceUrl": "https://x.com/i/status/2047012589302153558"
        },
        {
          "date": "2026-03-24",
          "note": "Building 3 and 4 look complete, but are not fully operational.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025014756"
        },
        {
          "date": "2026-01-15",
          "note": "The 1 GW substation looks close to completion.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-24",
          "note": "Building 2 is fully operational.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025007742"
        },
        {
          "date": "2025-09-26",
          "note": "Building 1 is fully operational around this date.",
          "source": "Epoch AI, citing crusoe.ai",
          "sourceUrl": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live"
        },
        {
          "date": "2025-06-28",
          "note": "Building 1 looks close to finishing construction, with chillers in place.",
          "source": "Epoch AI, citing openai.com",
          "sourceUrl": "https://openai.com/index/five-new-stargate-sites/"
        },
        {
          "date": "2024-05-31",
          "note": "Land clearing begins for northern two buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://drive.google.com/file/d/1oHWA9vmpvFOh-LvDy5fgq_wq5ITuxd1r/view?usp=sharing",
          "title": "Crusoe 2024 Impact Report, with details on Abilene"
        },
        {
          "url": "https://drive.google.com/file/d/1FgfX6hqojlBtqNXJHjzJmnwWAMx4_M0b/view?usp=sharing",
          "title": "Air Permit Application for buildings 1-2, featuring blueprints on p.157"
        },
        {
          "url": "https://www.mortenson.com/projects/abilene-data-center-development",
          "title": "Mortensen’s profile of the project, with details of substations"
        }
      ]
    },
    {
      "slug": "openai-stargate-lordstown",
      "name": "OpenAI Stargate Lordstown",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-lordstown/",
      "state": "OH",
      "state_name": "Ohio",
      "city": "Warren",
      "county": "Trumbull County",
      "latitude": 41.143721,
      "longitude": -80.883293,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2026-02-27",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Softbank",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-30",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-07-30",
      "planned_mw": 300,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-30",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 8106748000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-30",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-30",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-10-12",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-02-27",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-30",
          "note": "Active construction visible on and around the datacenter, with the roofing mostly in place.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-27",
          "note": "Still no visible construction, although construction within preexisting facilities.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-12",
          "note": "Land clearing begins in the front of the site, clearing away a parking lot and solar array.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/",
          "title": "Announcement of 5 new Stargate sites mentioning Lordstown"
        },
        {
          "url": "https://drive.google.com/file/d/1VfWvb9unUXZs3u4zwBjZjQwtsu91y8i9/view?usp=drivesdk",
          "title": "Water Quality Permitting stating that “manufacturing and assembly” is the main purpose of the construction"
        },
        {
          "url": "https://drive.google.com/file/d/1xl4Ql2jdmKhcYFhn43ymM2TJ56Z8cInL/view?usp=drivesdk",
          "title": "Stormwater Permitting"
        }
      ]
    },
    {
      "slug": "openai-stargate-michigan",
      "name": "OpenAI Stargate Michigan",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-michigan/",
      "state": "MI",
      "state_name": "Michigan",
      "city": "Saline Township",
      "county": "Washtenaw County",
      "latitude": 42.117881,
      "longitude": -83.841486,
      "location_precision": "city",
      "location_source_url": "https://www.related-digital.com/michigan",
      "stage": "Under construction",
      "stage_date": "2026-03-12",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Oracle",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-03-12",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-03-12",
      "planned_mw": 1383,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-03-12",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 37427416000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-03-12",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-03-12",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-12-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-03-12",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-03-12",
          "note": "Groundwork is visible for Building 1, at the left end of the site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-20",
          "note": "Land clearing continues for all buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-04",
          "note": "Land clearing begins for the entire site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.related-digital.com/michigan",
          "title": "Related Digital website for this site"
        },
        {
          "url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center",
          "title": "Michigan Public Service Commission Energy Contract Approval, reports 1,383 MW as the site capacity"
        },
        {
          "url": "https://drive.google.com/file/d/16ZucHKYmld7dLApSXNtbknOyagSn5E-r/view?usp=sharing",
          "title": "Air Permitting, calls the site Project Mitten, includes site map"
        },
        {
          "url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT",
          "title": "DTE Electric’s contract approval"
        },
        {
          "url": "https://www.thesalinebarn.com/",
          "title": "Website with more details for locals about the site"
        }
      ]
    },
    {
      "slug": "openai-stargate-milam",
      "name": "OpenAI Stargate Milam",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-milam/",
      "state": "TX",
      "state_name": "Texas",
      "city": null,
      "county": "Milam County",
      "latitude": 30.791242,
      "longitude": -96.984395,
      "location_precision": "county",
      "location_source_url": "https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/",
      "stage": "Under construction",
      "stage_date": "2026-01-04",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Softbank",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-03-23",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-03-23",
      "planned_mw": 1200,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-03-23",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 32464874000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-03-23",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-03-23",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-09-27",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-01-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-03-23",
          "note": "Steel framing and roofing is underway for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-04",
          "note": "Small sections of building foundation construction begins, and land clearing appears to be mostly finished.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-27",
          "note": "Land clearing begins for the site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/",
          "title": "Data Center Dynamics article on the site"
        },
        {
          "url": "https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/",
          "title": "SB Energy article, source for 1.2 GW capacity"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026017746",
          "title": "TDLR page for the first building of the site, indicating construction completion date"
        }
      ]
    },
    {
      "slug": "openai-stargate-new-mexico",
      "name": "OpenAI Stargate New Mexico",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-new-mexico/",
      "state": "NM",
      "state_name": "New Mexico",
      "city": null,
      "county": "Doña Ana County",
      "latitude": 32.349919,
      "longitude": -106.834968,
      "location_precision": "county",
      "location_source_url": "https://projectjupitertogether.com/",
      "stage": "Under construction",
      "stage_date": "2026-02-06",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Oracle",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-06-22",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-06-22",
      "planned_mw": 2450,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-06-22",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 66293500000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-06-22",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Bloom Energy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-06-22",
      "last_changed": "2026-06-22",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-02-06",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-06-22",
          "note": "Construction has advanced significantly since February 2026.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-06",
          "note": "Land clearing continues, foundation construction begins 2 of the main buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-01",
          "note": "Construction and land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://projectjupitertogether.com/",
          "title": "Project Jupiter Website"
        },
        {
          "url": "https://drive.google.com/file/d/1vVKvPogq2TkeFn7ibnp0GNqz8aB4tZXz/view?usp=sharing",
          "title": "Stormwater Permitting"
        },
        {
          "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
          "title": "Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology (Apr 27, 2026)"
        }
      ]
    },
    {
      "slug": "openai-stargate-shackelford",
      "name": "OpenAI Stargate Shackelford",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-shackelford/",
      "state": "TX",
      "state_name": "Texas",
      "city": "Abilene",
      "county": null,
      "latitude": 32.453618,
      "longitude": -99.731133,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2026-01-18",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Oracle",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-09-04",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-09-04",
      "planned_mw": 1960,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-09-04",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 53034800000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-09-04",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-09-04",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-08-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-01-18",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-09-04",
          "note": "Buildings 1-5 shells complete and fully roofed.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-14",
          "note": "Steel framing is underway for Buildings 1-3, and roofing is underway for Building 1.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-18",
          "note": "The layout of Buildings 1-5 is visible.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-08-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "title": "Vantage data center page with power capacity, number of buildings, and first building timeline"
        },
        {
          "url": "https://openai.com/index/five-new-stargate-sites/",
          "title": "OpenAI Stargate expansion announcement mentioning Shackelford site"
        },
        {
          "url": "https://web.archive.org/web/20260226203340/https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs",
          "title": "Vantage LinkedIn post connecting the data center to OpenAI Stargate"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026024094",
          "title": "TDLR filing for first building (other buildings are also on TDLR)"
        }
      ]
    },
    {
      "slug": "openai-stargate-wisconsin",
      "name": "OpenAI Stargate Wisconsin",
      "url": "https://joltrents.com/data-centers/projects/openai-stargate-wisconsin/",
      "state": "WI",
      "state_name": "Wisconsin",
      "city": "Port Washington",
      "county": "Ozaukee County",
      "latitude": 43.384921,
      "longitude": -87.884134,
      "location_precision": "city",
      "location_source_url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
      "stage": "Under construction",
      "stage_date": "2026-02-14",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "Oracle",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-24",
      "tenant": "OpenAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-07-24",
      "planned_mw": 1300,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-24",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 34169564000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-24",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-24",
      "stages": [
        {
          "stage": "Site work",
          "date": "2026-01-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-02-14",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-24",
          "note": "Construction continues, Buildings 1 and 2 appear roughly halfway roofed, and building 3 foundation is halfway done.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-14",
          "note": "Land clearing continues, foundation construction clearly begins for eastern and northern buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-02",
          "note": "Ground broken for the facility, land clearing begins for all buildings.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
          "title": "Data center page on Vantage website"
        },
        {
          "url": "https://drive.google.com/file/d/1ft2ZzqAYZtsTqMwyML4eo_EFYuclVxE6/view?usp=sharing",
          "title": "Environmental Analysis Summary"
        }
      ]
    },
    {
      "slug": "qts-cedar-rapids",
      "name": "QTS Cedar Rapids",
      "url": "https://joltrents.com/data-centers/projects/qts-cedar-rapids/",
      "state": "IA",
      "state_name": "Iowa",
      "city": "Fairfax",
      "county": "Linn County",
      "latitude": 41.905594,
      "longitude": -91.751082,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2025-10-27",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 1587,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-10-23",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 42920306000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-10-23",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Alliant Energy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-10-23",
      "last_changed": "2026-10-23",
      "stages": [
        {
          "stage": "Site work",
          "date": "2025-01-17",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-10-27",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-10-23",
          "note": "Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-05-07",
          "note": "Similar to April, Buildings 1-3 shells look complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-04-16",
          "note": "Based on satellite imagery, the Buildings 1-3 shells look complete.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-10-27",
          "note": "Building 1 roof complete, with air-cooled chillers in place.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-01-17",
          "note": "Land clearing begins for Building 1-3.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf",
          "title": "MISO new load announcements"
        },
        {
          "url": "https://www.thegazette.com/business/fast-start-to-cedar-rapids-data-center-projects/",
          "title": "Article by The Gazette"
        },
        {
          "url": "https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/",
          "title": "Article by Corridor Business Journal"
        },
        {
          "url": "https://www.gldcommercial.com/google-and-qts-data/",
          "title": "Post by GLD Commercial"
        },
        {
          "url": "https://newsletter.semianalysis.com/p/meta-compute-everyone-wants-to-be",
          "title": "Post by SemiAnalysis"
        }
      ]
    },
    {
      "slug": "qts-eagle-mountain",
      "name": "QTS Eagle Mountain",
      "url": "https://joltrents.com/data-centers/projects/qts-eagle-mountain/",
      "state": "UT",
      "state_name": "Utah",
      "city": "Eagle Mountain",
      "county": "Utah County",
      "latitude": 40.268886,
      "longitude": -112.034294,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Under construction",
      "stage_date": "2026-05-02",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 411,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-02",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 11516128000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-02",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-02",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2026-05-02",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-02",
          "note": "Building 1 roof finished.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-09-08",
          "note": "Site preparation continues.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2023-10-01",
          "note": "First signs of site preparation show up on satellite imagery.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://q.com/data-centers/eagle-mountain/",
          "title": "QTS Eagle Mountain website"
        },
        {
          "url": "https://daqpermitting.utah.gov/DocViewer?IntDocID=155764&contentType=application/pdf",
          "title": "DEQ Approval listing emergency generators"
        }
      ]
    },
    {
      "slug": "qts-richmond-1",
      "name": "QTS Richmond 1",
      "url": "https://joltrents.com/data-centers/projects/qts-richmond-1/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Sandston",
      "county": "Henrico County",
      "latitude": 37.488827,
      "longitude": -77.24749,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-01-29",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 333,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-02-13",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 9015916000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-02-13",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Dominion Energy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-02-13",
      "last_changed": "2026-02-13",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2023-09-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-01-29",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-02-13",
          "note": "No changes to the site since December 2025.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-31",
          "note": "No changes to the site since November 2025.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-19",
          "note": "Building 5 is operational, based on a complete building and full carpark in a Google Earth image.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.48747566,-77.2485616,47.03705985a,2549.72172121d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI1LTExLTE5GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE"
        },
        {
          "date": "2025-06-03",
          "note": "Building 4 is operational, based on a complete building and full carpark in a Google Earth image.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.48350155,-77.25010039,60.24751599a,83.68032361d,30.00094375y,3.66969189h,0t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ"
        },
        {
          "date": "2025-02-04",
          "note": "Building 3 is operational, based on the building looking complete and the carpark to the south being full.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-06-23",
          "note": "Building 2 is operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-01-29",
          "note": "Building 1 is operational.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.4875167,-77.24806799,43.67572425a,2395.6622579d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI0LTAyLTA2GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE"
        },
        {
          "date": "2023-11-02",
          "note": "Building 1 and 2 retrofitting has begun.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.48913637,-77.24705465,44.31788662a,1464.06665017d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDIzLTExLTAyGAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE"
        },
        {
          "date": "2023-09-01",
          "note": "Land clearing begins for site expansion, some materials down at substation site.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://qtsdatacenters.com/data-centers/richmond-1/",
          "title": "Richmond 1 factsheet"
        },
        {
          "url": "https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000",
          "title": "Environmental permit detailing power generation"
        }
      ]
    },
    {
      "slug": "qts-richmond-2",
      "name": "QTS Richmond 2",
      "url": "https://joltrents.com/data-centers/projects/qts-richmond-2/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Sandston",
      "county": null,
      "latitude": 37.510723,
      "longitude": -77.311556,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-02-04",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 252,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-14",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 6818760000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-14",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Dominion Energy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-05-14",
      "last_changed": "2026-05-14",
      "stages": [
        {
          "stage": "Site work",
          "date": "2022-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2024-01-29",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-02-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-14",
          "note": "Building 5 is estimated to be operational, based on the previous entry.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-13",
          "note": "Building 5 still has construction work at the perimeter, but given how close it looks to completion, we estimate it's only about 3 months away from operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-31",
          "note": "Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-19",
          "note": "The west substation looks complete, based on a Google Earth image.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.48673632,-77.24119214,61.15398527a,3616.77426559d,30.00094375y,0.00000001h,0.59183057t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ"
        },
        {
          "date": "2025-02-04",
          "note": "Building 1 and 2 are operational, based on the east substation looking complete and the carparks being more full.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-06-23",
          "note": "Still not many cars parked at Building 1 and 2, and the east substation looks very close to completion, based on a Google Earth image.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.48655608,-77.24244153,55.96289131a,2859.52501034d,30.00094375y,0h,0.5917603t,0r/data=ChYqEAgBEgoyMDI0LTA2LTIzGAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE"
        },
        {
          "date": "2024-01-29",
          "note": "Building 1 and 2 look complete but we don't think they are operational, as the substation is still under construction.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-04-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://qtsdatacenters.com/data-centers/richmond-1/",
          "title": "Richmond 2 factsheet"
        },
        {
          "url": "https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000",
          "title": "Environmental permit detailing power generation"
        }
      ]
    },
    {
      "slug": "qts-richmond-3",
      "name": "QTS Richmond 3",
      "url": "https://joltrents.com/data-centers/projects/qts-richmond-3/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Sandston",
      "county": null,
      "latitude": 37.510723,
      "longitude": -77.311556,
      "location_precision": "city",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-02-13",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 336,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-14",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 9091680000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-14",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": "Dominion Energy",
      "utility_or_energy_company_source_url": "https://epoch.ai/data/ai-data-centers",
      "utility_or_energy_company_source_date": "2026-05-14",
      "last_changed": "2026-05-14",
      "stages": [
        {
          "stage": "Site work",
          "date": "2024-04-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Under construction",
          "date": "2025-02-04",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-02-13",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-14",
          "note": "Building 2 and 3 are operational, based on the previous entry.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-02-13",
          "note": "Building 1 is operational, based on the substation being completed earlier and cars in the carpark.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-12-31",
          "note": "The substation looks complete, but we expect Building 1 still needs commissioning before it is fully operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-11-19",
          "note": "The substation is still under construction, based on a Google Earth image, so we don't think any buildings are operational yet.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/@37.48033002,-77.25002949,65.53442036a,2152.9927926d,30.00094375y,-0.00000001h,0.59169466t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ"
        },
        {
          "date": "2025-02-04",
          "note": "Building 1 shell is mostly complete, with some chillers installed on the roof.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-04-01",
          "note": "Land clearing begins.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://q.com/data-centers/richmond-3/",
          "title": "Richmond 3 factsheet"
        },
        {
          "url": "https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000",
          "title": "Environmental permit detailing power generation"
        }
      ]
    },
    {
      "slug": "stack-infrastructure-nva02",
      "name": "STACK Infrastructure NVA02",
      "url": "https://joltrents.com/data-centers/projects/stack-infrastructure-nva02/",
      "state": "VA",
      "state_name": "Virginia",
      "city": "Manassas",
      "county": "Prince William County",
      "latitude": 38.749819,
      "longitude": -77.535848,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2024-10-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 487,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-02-14",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 13182936000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-02-14",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-02-14",
      "stages": [
        {
          "stage": "Site work",
          "date": "2019-10-19",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2024-10-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-02-14",
          "note": "All buildings have begun construction, as depicted by satellite imagery.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2024-10-01",
          "note": "Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished.",
          "source": "Epoch AI, citing earth.google.com",
          "sourceUrl": "https://earth.google.com/web/search/38%c2%b044%2745%2e12%22N+77%c2%b032%2716%2e47%22W/@38.7458667,-77.5379083,83.89135729a,642.01325639d,35y,0h,0t,0r/data=CjQiJgokCTo0Rh9P7TVAETk0Rh9P7TXAGX6C6a6li0VAIQ_0AAa-ik7AKgYIARIAGAFCAggBQgIIAEoNCP___________wEQAA"
        },
        {
          "date": "2019-10-19",
          "note": "Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the news and visible on satellite imagery.",
          "source": "Epoch AI, citing bisnow.com",
          "sourceUrl": "https://www.bisnow.com/washington-dc/news/data-center/peterson-cos-partnering-to-build-4m-sf-data-center-campus-in-manassas-102646"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva02/",
          "title": "Official website for NVA02, showcasing their project."
        },
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-northern-virginia-data-center-campus/",
          "title": "Most recent official schematic of the NVA02 campus."
        },
        {
          "url": "https://www.deq.virginia.gov/home/showpublisheddocument/25966/638633868679100000",
          "title": "Air quality permit from the state of Virginia."
        }
      ]
    },
    {
      "slug": "stream-phoenix",
      "name": "Stream Phoenix",
      "url": "https://joltrents.com/data-centers/projects/stream-phoenix/",
      "state": "AZ",
      "state_name": "Arizona",
      "city": "Goodyear",
      "county": "Maricopa County",
      "latitude": 33.419503,
      "longitude": -112.35784,
      "location_precision": "address",
      "location_source_url": "https://www.streamdatacenters.com/locations/phoenix/",
      "stage": "Operating",
      "stage_date": "2026-05-01",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 267,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-05-01",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 8334040000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-05-01",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-05-01",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2022-10-30",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-05-01",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-05-01",
          "note": "Estimated: AI building 1 should be operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2026-01-31",
          "note": "Major construction has finished on AI building 1, and AI building 6 has been expedited, as depicted by satellite imagery.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2022-10-30",
          "note": "Construction beginning, as can be seen on satellite.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.streamdatacenters.com/locations/phoenix/",
          "title": "Official page for the data center."
        },
        {
          "url": "https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf",
          "title": "Official pre-construction planning document."
        }
      ]
    },
    {
      "slug": "vantage-tx1",
      "name": "Vantage TX1",
      "url": "https://joltrents.com/data-centers/projects/vantage-tx1/",
      "state": "TX",
      "state_name": "Texas",
      "city": "San Antonio",
      "county": "Bexar County",
      "latitude": 29.416684,
      "longitude": -98.788564,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2026-02-15",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": null,
      "developer_source_url": null,
      "developer_source_date": null,
      "tenant": null,
      "tenant_source_url": null,
      "tenant_source_date": null,
      "planned_mw": 179,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-02-15",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 4848896000,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-02-15",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-02-15",
      "stages": [
        {
          "stage": "Site work",
          "date": "2023-12-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2026-02-15",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-02-15",
          "note": "Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well.",
          "source": "Epoch AI, citing tdlr.texas.gov",
          "sourceUrl": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561"
        },
        {
          "date": "2023-12-15",
          "note": "Land clearing begins for both Building 1 & Building 2.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561",
          "title": "Construction Permitting for TX11"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026001234",
          "title": "Construction Permitting for TX12"
        },
        {
          "url": "https://drive.google.com/file/d/1rbF-RT5Sq-iZ26hK5cKzbM2K4Vq2vObY/view?usp=sharing",
          "title": "Air quality permitting that references TX13"
        }
      ]
    },
    {
      "slug": "xai-qts-atlanta",
      "name": "xAI QTS Atlanta",
      "url": "https://joltrents.com/data-centers/projects/xai-qts-atlanta/",
      "state": "GA",
      "state_name": "Georgia",
      "city": "Atlanta",
      "county": "Fulton County",
      "latitude": 33.775662,
      "longitude": -84.422576,
      "location_precision": "address",
      "location_source_url": "https://epoch.ai/data/ai-data-centers",
      "stage": "Operating",
      "stage_date": "2025-02-20",
      "stage_source_name": "Epoch AI",
      "stage_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer": "SpaceXAI",
      "developer_source_url": "https://epoch.ai/data/ai-data-centers",
      "developer_source_date": "2026-07-10",
      "tenant": "SpaceXAI",
      "tenant_source_url": "https://epoch.ai/data/ai-data-centers",
      "tenant_source_date": "2026-07-10",
      "planned_mw": 24,
      "planned_mw_source_url": "https://epoch.ai/data/ai-data-centers",
      "planned_mw_source_date": "2026-07-10",
      "announced_investment_usd": null,
      "announced_investment_usd_source_url": null,
      "announced_investment_usd_source_date": null,
      "epoch_capital_cost_estimate_usd": 656484074,
      "epoch_capital_cost_estimate_usd_source_url": "https://epoch.ai/data/ai-data-centers",
      "epoch_capital_cost_estimate_usd_source_date": "2026-07-10",
      "acres": null,
      "acres_source_url": null,
      "acres_source_date": null,
      "buildings": null,
      "buildings_source_url": null,
      "buildings_source_date": null,
      "general_contractor": null,
      "general_contractor_source_url": null,
      "general_contractor_source_date": null,
      "utility_or_energy_company": null,
      "utility_or_energy_company_source_url": null,
      "utility_or_energy_company_source_date": null,
      "last_changed": "2026-07-10",
      "stages": [
        {
          "stage": "Under construction",
          "date": "2024-01-23",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "stage": "Operating",
          "date": "2025-02-20",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        }
      ],
      "notes": [
        {
          "date": "2026-07-10",
          "note": "No significant change to the building since the August 2025 image.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-08-21",
          "note": "No significant change to the building since the cluster became operational.",
          "source": "Epoch AI",
          "sourceUrl": "https://epoch.ai/data/ai-data-centers"
        },
        {
          "date": "2025-02-20",
          "note": "XAI's GPU cluster in the QTS Atlanta building at 1025 Jefferson Street NW is operational around this time.",
          "source": "Epoch AI, citing businessinsider.com",
          "sourceUrl": "https://www.businessinsider.com/xai-elon-musk-x-new-atlanta-data-center-2025-2"
        },
        {
          "date": "2024-01-23",
          "note": "X Corp's $700 million investment in AI training hardware for the Atlanta data center is approved by the Development Authority of Fulton County.",
          "source": "Epoch AI, citing developfultoncounty.com",
          "sourceUrl": "https://www.developfultoncounty.com/meetings-and-minutes_239_547601452.pdf"
        }
      ],
      "sourceLinks": [
        {
          "url": "https://www.developfultoncounty.com/meetings-and-minutes_239_547601452.pdf",
          "title": "Develop Fulton bond fact sheet: X Corp Generative AI Equipment Project (Jan 23, 2024)"
        },
        {
          "url": "https://www.businessinsider.com/xai-elon-musk-x-new-atlanta-data-center-2025-2",
          "title": "Business Insider: Elon Musk's new Atlanta data center for xAI has $700 million in AI equipment"
        },
        {
          "url": "https://fortune.com/2025/01/24/elon-musk-xai-sharing-x-equipment-gpus-datacenter-georgia-tax-breaks-documents/",
          "title": "Fortune: Elon Musk's xAI is sharing X's equipment at its Atlanta data center (Jan 24, 2025)"
        }
      ]
    }
  ]
}