A rented generator, fuel runs and noise all day. Our estimate for a Base office run on a generator, with fuel runs, internet and a camera, is $2,308 a month.
What JOLT changes
Grid-Free carries roof solar, a 10 kWh battery, Starlink and a camera. The battery runs the heat and A/C. $1,495 a month. Nothing to refuel.
Crews warm up in trucks. Snow buries tools left out. Light runs out early.
What JOLT changes
Mini-split heat in every office. Alpine adds backup heat, an over-roof and a covered entry deck. Steel storage keeps tools dry and locked.
Tools that walk off at night
What it costs you
Equipment theft costs U.S. contractors an estimated $300 million to $1 billion a year (National Equipment Register and NICB). Most of it is never recovered.
What JOLT changes
One-trip steel storage with a welded lockbox. WATCH adds a solar LTE camera with motion alerts for $129 a month. It comes built in on Grid-Free and Alpine.
Nowhere to meet the owner or the inspector
What it costs you
Walkthroughs happen on a tailgate. Plans ride on a truck seat.
What JOLT changes
A clean, lit office with a plan table (READY), Starlink for plans, email and video calls, and your logo on the door.
Delivery to Gypsum is $450 for a 10, 12 or 20 ft unit and $1,550 for a 40 ft unit, each way; pickup costs the same. Rent is monthly, and both legs are prepaid on the first invoice.
Pick a length
Drawn to scale, side view.
A 20 ft rides a tilt-deck trailer behind a pickup.
1
Step 1: Unit
20 ft office container — Grid-Free
Which 20 ft?
Up to 10; more, call the yard.
2
Step 2: Rent or buy
3122436
3-month minimum.
3
Step 3: Job ZIP
Gypsum, CO · Colorado, Zone A · 0 miles from the yard
Colorado, Zone A · 0 miles
Gypsum yard on I-70Gypsum
Rent before fees$1,495/mo
4
Step 4: Send it
5
Step 5: Your delivered price
Delivery fees for Gypsum
Delivery fees for Gypsum (Zone A), per unit
Unit
Delivery each way
Pickup
10, 12 or 20 ft
Delivery each way$450
Pickup$450
40 ft
Delivery each way$1,550
Pickup$1,550
By Lisa Tanner, Content Writer · Updated · Published
Every JOLT office is built and outfitted at our yard in Gypsum, Colorado, then shipped to the job. See how.
Placing an office in Gypsum
JOLT offices and containers are mobile and temporarily placed, so no place JOLT delivers requires a permit to use one. We help you plan the placement.
On a private lot
No permit is needed to use a JOLT office or container on a private lot in Gypsum, because it is mobile and temporarily placed. Our yard is in Gypsum, but each jobsite has its own access questions. Start with the property boundaries and intended office location. A Gypsum industrial yard differs from an airport-area parcel or a new graded home site. Photograph the entry, turning area and proposed pad. We can review the approach before you decide on a container length. Mark the door direction and the corners on a sketch. Show how workers reach the office during active construction. Leave space for both unloading and the later return truck.
We can supply unit dimensions for the site sketch.
We help with office and access details for those conversations. Mark utilities before selecting the final pad.
On a street or sidewalk
No permit is needed to use a JOLT office or container on a Gypsum street or sidewalk, because it is mobile and temporarily placed. A short movement from our yard still needs room to enter and leave. US-6 frontage can carry through traffic as well as site vehicles. Keep a clear public route beside the proposed work. Note any sidewalk or worker path on your drawing. We can compare that space with the truck's alignment needs.
The area around Eagle County Regional Airport has another property contact. Add the airport's truck route to the placement sketch. If an airport-area entrance changes, update the route notes.
For an industrial frontage site, map movements around ongoing operations. Temporary fence can define a work edge. Its galvanized chain-link panels are 6 ft by 10 ft. Leave clear openings for authorized vehicles. Position the office door on the worker side of that boundary. Photograph where the loaded truck will turn from the street. A fence line that crosses the unloading lane needs revision before placement. Keep the final arrangement consistent with the property's plan.
HOA and deed restrictions
Ask the Gypsum property owner or association about location and visibility. Rental Agreement §5 covers HOA and landlord consents. Show the office's visible sides on the drawing. If the entrance is gated, confirm who admits the truck. Save any change to the pad in the field instructions.
An Alpine office has a matte black mountain exterior. Cedar surrounds, a standing-seam over-roof and covered entry deck complete its appearance. If they request a different position, check the new sun exposure. Check its truck access and drainage too. We can revisit unit selection after the location is settled. Keep the same drawing with the site representative and property contact.
Getting the site ready
Prepare a firm, level, well-drained pad. Rental Agreement §5 calls for marked utilities and sufficient route clearance. Allow about 70 ft straight for a 20 ft unit. A 40 ft unit calls for about 100 ft. Check road width, grade, turning and overhead space as well. A freshly graded Gypsum lot can still have soft fill. Walk its approach after rain or thaw.
Clear pallets, trailers and work trucks before the unit arrives. Stake the pad corners and mark the intended door side. Choose one representative who can direct final placement. That person should have authority to answer route questions. Check that the driver can turn and leave. Preserve the exit after utility crews move in. Protect the future return lane from stored materials. A short local route cannot compensate for a blocked final approach.
Choose storage by frequency of access. The 12 ft walk-in container has a man door and one barred window. At a compact Gypsum pad, 10 ft storage fits where a 20 ft box cannot. For palletized industrial material, 20 ft storage has cargo doors. Its four lock bars and welded lockbox secure the opening. On a Gypsum industrial pad, the 40 ft high-cube stands 9 ft 6 in tall. It provides twice the floor of the 20 ft box. Preserve enough room to work its cargo doors.
At a broader Gypsum site, the 40 ft bathroom office places its enclosed bathroom at the far end. Plan a 50-amp shore-power connection for that larger office. Confirm the power source and longer truck line before choosing it. A compact 20 ft office may suit a smaller Gypsum lot. Give workers a clear path between office and active work. Add storage only if material access fits too. Keep any fence outside the truck's alignment line. Revisit this layout as the project moves toward closeout.
The drive from Gypsum
Every route begins at our Gypsum yard. The yard sits off I-70 at the Eagle River valley's west end. I-70 Exit 140 serves Gypsum. US-6 runs through town and east toward Eagle. We choose the approach from the specific site address. An airport-area turn differs from an industrial-yard entrance. Show the route from the public road through the last gate. Local distance alone does not measure a truck's turning room.
The yard is also the start for work farther east in Edwards, Avon and Beaver Creek. A Gypsum set can be close to us yet require careful pad preparation. Tell us whether the site uses Exit 140 or a US-6 approach. Identify any temporary traffic pattern near the work. Check for new equipment beside the gate before the truck travels. Our local position can help us discuss a questionable turn. The site's final geometry still controls placement.
Where JOLT fits best
A long Gypsum job may need an office, material storage and fence together. We can plan them around one work area. American Gypsum operates a wallboard plant and mine here, per its website. Industrial maintenance may need controlled materials near an office. A 20 ft storage container serves that material role. Put its cargo doors away from the office walking path. For daily tool issue, use a 12 ft walk-in crib instead. Position the man door toward the crew.
The Base office fits a Gypsum pad with 50-amp shore power. Grid-Free works before that service is ready. At a Gypsum pad, its 10 kWh battery runs HVAC without shore power. Sunlight and load determine solar output. A larger industrial lot may support the bathroom office's longer set line. On a tighter service pad, keep the office compact. We can compare equipment and access from the same site sketch. The simplest field setup is the one the crew can actually reach.
Built for Gypsum weather
Gypsum stands at 6,401 ft according to USGS GNIS. It is the lowest Eagle County town we serve. Its snow season is generally shorter than Vail's. Freezing weather and spring thaw still affect a truck approach. Direct runoff away from the Gypsum office pad. Keep soft shoulders out of the turning path. Make room for snow storage beyond the straight lane. Check whether plowing blocks the office door. Reinspect a graded lot when the frost comes out.
The Base office includes mini-split heat and cooling. For Gypsum, connect its 50-amp inlet to an available shore-power source. Grid-Free includes POWER solar, CONNECT Starlink and a WATCH camera. At this Gypsum winter site, its 10 kWh battery powers HVAC without shore power. Sunlight and electrical load affect performance. For Gypsum's winter approach, Alpine adds backup heat and a covered entry. Place that entry away from the local plow path. Keep roof solar exposure clear of stacked materials.
Verify your exact address for delivery. A ground heater can thaw ground and cure winter concrete. Put its trailer outside the office entry route. A light tower can illuminate outdoor work on a site. Reserve a stable spot for that trailer too. An office's heat does not clear its surrounding snow. Assign the crew a daily route and drainage check.
Inspect the actual office location after weather changes. Position the WATCH camera toward the controlled approach. Plan a usable sky view for CONNECT at that address. The one-trip container answer helps explain a storage selection. Keep attention on the pad and access, not only the container. Gypsum's nearby yard makes communication easier, while the site still needs a prepared working line.
Who rents JOLT offices in Gypsum
Wallboard and industrial maintenance crews
American Gypsum operates a plant and mine in town. A Base office can give an industrial superintendent a separate field room. Use 20 ft storage for materials behind cargo doors. Confirm the plant's authorized entrance and pad. Leave room for ongoing site vehicles around both units.
Airport-area contractors
Eagle County Regional Airport is at 219 Eldon Wilson Road. A Grid-Free office can serve a work area without shore power. Obtain the airport's access and escort direction first. Mark the route for the truck and representative. Keep office movement separate from operational airport traffic.
Residential building teams
A new Gypsum lot may need a foreman's office before utility service. Grid-Free has a battery that runs HVAC. A 10 ft walk-in box fits where longer storage cannot. Check whether grading leaves a firm truck approach. Move snow storage away from the designated pad.
Valley service and commercial crews
Work near US-6 may need a compact office and controlled tool access. A 12 ft crib puts its man door along the worker path. Add fence around the laydown. Keep the public road and truck turn clear. Confirm Town or County jurisdiction for the actual parcel.
How we built this page: rent, upgrade and delivery figures come from the JOLT catalog at build time. Street, HOA and weather facts are linked to their sources in the text. Written and reviewed by Lisa Tanner.
Last updated .
Questions Gypsum contractors ask
What comes in a JOLT office for a Gypsum job?
Every 20 ft office has heat and A/C, lights, outlets, a vinyl-plank floor, a 36-inch steel door and two barred windows. Grid-Free adds roof solar, a 10 kWh battery, Starlink and a camera. Offices rent from $795 a month.
Can the office run before the site has power?
Yes. Grid-Free runs its heat and A/C, lights, outlets and Starlink from roof solar and a 10 kWh battery. Output depends on sun and load. It rents for $1,495 a month.
Can we put our logo on it?
Yes. BRAND applies your logo in 24 by 48 inch vinyl on two sides of the unit. $450, one time.
Do I need a permit for a jobsite office in Gypsum?
No. A JOLT office is mobile and temporarily placed, so you don't need a permit to use one in Gypsum, or anywhere JOLT delivers.
Can the office sit on a Gypsum street?
No. A JOLT office is mobile and temporarily placed, so you don't need a permit to use one on a Gypsum street, or anywhere JOLT delivers.
What does the site need before delivery?
A firm, level pad, a clear path for the truck, and a person on site to show the driver where it goes. Tell us about gates, slopes and overhead lines when you ask for the quote.
How much does delivery to Gypsum cost?
Delivery to Gypsum is $450 per 10,12 or 20 ft unit and $1,550 per 40 ft unit, each way (Zone A). Pickup is the same fee, and both legs are billed with the first invoice. Rent is published: offices from $795 a month, storage from $225.
How long can we rent, and can we buy?
In Colorado, offices and the 40 ft storage box rent for 3 months minimum; the 10,12 and 20 ft storage boxes, fence and site equipment for 1 month. You can also buy an office outright or lease-to-own a 20 ft office over 24 or 36 months.
Reserve your Gypsum office.
Offices from $795 a month
A deposit holds your delivery window. Cancel free of charge more than 14 days before the first day of the window. Deposits from $85 are applied to your first invoice.