CoreWeave Denton TX: data center in Denton, Texas

Operatingsince Epoch AI,

Project facts

Developer or owner
CoreWeaveEpoch AI,
Tenant or user
Not announced
Planned power (Epoch AI estimate)
395 MWEpoch AI,
Announced investment
Not announced
Capital cost (Epoch AI estimate)
$10.7 billionEpoch AI,
Acres
Not announced
Buildings
Not announced
General contractor
Not announced
Utility or energy company
Not announced
City
DentonEpoch AI,
County
Denton CountyEpoch AI,
State
TexasEpoch AI,

Where

OpenAI Stargate Shackelford, Abilene, TX: Under construction, 1,960 MWGoodnight, Claude, TX: Under construction, 1,294 MWOpenAI Stargate Milam, Milam County, TX: Under construction, 1,200 MWOpenAI Stargate Abilene, Abilene, TX: Operating, 1,154 MWCrusoe Abilene Expansion, Abilene, TX: Site work, 941 MWCoreweave Helios, Afton, TX: Operating, 800 MWCoreWeave Denton TX, Denton, TX: Operating, 395 MWAnthropic Barber Lake, Colorado City, TX: Under construction, 300 MWMeta Temple, Temple, TX: Operating, 231 MWGoogle Red Oak, Red Oak, TX: Operating, 185 MWVantage TX1, San Antonio, TX: Operating, 179 MWGoogle Midlothian, Midlothian, TX: Operating, 123 MWMicrosoft SAT40, San Antonio, TX: Operating, 106 MWMicrosoft SAT14, San Antonio, TX: Operating, 66 MW

Marked at the city centre its source gives. The ring marks CoreWeave Denton TX; the other pins are tracked projects in Texas.

Timeline

  1. Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.Epoch AI, citing tdlr.texas.gov,
  2. Recorded as Under constructionEpoch AI,
  3. First 8 MW billable tranche dedicated to AI starts running at the site, with another 40 scheduled by the end of the quarter.Epoch AI, citing investors.corescientific.com,
  4. Moved to OperatingEpoch AI,
  5. Half the campus energized.Epoch AI, citing d1io3yog0oux5.cloudfront.net,
  6. Buildings 1-3 are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed.Epoch AI,
  7. Buildings 1-3 are fully operational running AI.Epoch AI, citing fool.com,
  8. Buildings 1-7 are operational and running, with no construction work visible.Epoch AI, citing d1io3yog0oux5.cloudfront.net,
  9. Building 8 interior fit-out scheduled to begin.Epoch AI, citing tdlr.texas.gov,

More sources

Site offices for this build

Site offices for CoreWeave Denton TX, Texas

The Grid: badge-ready 40 ft container site offices, delivered to Texas by DC Deploy, quoted per campus.

Talk to a data center specialist

Other projects within 50 miles

No other tracked project is within 50 miles of Denton.

See every project on the data center construction mapData centers under construction in Texas

Includes data from Epoch AI, Data on AI data centers, used under CC BY 4.0. JOLT rewrote Epoch AI's status notes as one sentence each and added dated company, state, county and utility sources.

One email when CoreWeave Denton TX changes stage or gets a new dated note. Unsubscribe in one click.

New projects and stage changes, every Monday. Unsubscribe in one click.