How to Budget a Site Office in General Conditions
Budget a jobsite field office as Division 01 bid lines, months times the monthly lines plus delivery and pickup, with free spec sheets and CAD blocks.
Transcript
Published on .
0:00How do you budget a site office?
A site office goes into general conditions as months on site times the monthly lines, plus delivery and pickup as two lump sums.
The monthly lines are the rent, the damage waiver and the environmental fee. Date the number, and give each year of a long job its own row.
0:17Where are the spec sheets and CAD blocks?
The JOLT estimator kit does the math for your job ZIP and lays it out as Division 01 bid lines, dated, ready to paste into the estimate.