Jolt Rents
970-279-1015

Irving · Jobsite offices and secure storage

Irving jobsite offices built for heat and rain

Heat and A/C in every office. Solar, Starlink and a camera on Grid-Free. Your logo on the door. Delivered to Irving jobs.

Offices from $795 a month. Project quote in one business day.

  • Heat and A/C in every office
  • Runs with no power pole (Grid-Free)
  • Starlink and camera options
  • Your logo on the office
Grid-Free jobsite office with roof solar, ready for a Irving job

What slows a Irving job down

No power on day one

What it costs you

A rented generator, fuel runs and noise all day. Our estimate for a Base office run on a generator, with fuel runs, internet and a camera, is $2,308 a month.

What JOLT changes

Grid-Free carries roof solar, a 10 kWh battery, Starlink and a camera. The battery runs the heat and A/C. $1,495 a month. Nothing to refuel.

See the math

No cool place to take a break

What it costs you

Crews cool off in idling trucks. Afternoons slow down. Plans and laptops sit on the dash.

What JOLT changes

Every office has a mini-split for cooling and heat. Grid-Free runs it from its own battery.

Tools that walk off at night

What it costs you

Equipment theft costs U.S. contractors an estimated $300 million to $1 billion a year (National Equipment Register and NICB). Most of it is never recovered.

What JOLT changes

One-trip steel storage with a welded lockbox. WATCH adds a solar LTE camera with motion alerts for $129 a month. It comes built in on Grid-Free and Alpine.

Nowhere to meet the owner or the inspector

What it costs you

Walkthroughs happen on a tailgate. Plans ride on a truck seat.

What JOLT changes

A clean, lit office with a plan table (READY), Starlink for plans, email and video calls, and your logo on the door.

Three offices. Pick the one your site needs.

Your name on the job

Owners, neighbors, inspectors and your next hire see the site every day. The office is the building they see.

BRAND puts your logo on two sides of the unit, 24 by 48 inches. $450, one time.

Offices from national chains carry the chain's name. A JOLT office carries yours.

How BRAND works

Grid-Free office on a Irving site with a placeholder for your logo on the side

Get a delivered quote for Irving

How the project quote works

  1. Pick the office, the term and the job ZIP.
  2. We route it from the nearest JOLT source yard and price the set for your site.
  3. You get a written delivered quote within one business day. It holds for 14 days.

What delivery includes

Placement on your prepared pad and pickup at the end of the term. Rent, upgrades and deposits are published below.

Pick a length

Drawn to scale, side view.

A 20 ft rides a tilt-deck trailer behind a pickup.

Step 1: Unit

20 ft office container — Grid-Free

Which 20 ft?

Up to 10; more, call the yard.

Step 2: Rent or buy

12 months

12-month starting term for project quotes.

Renting 12 months or more? Lease-to-own ends with the office yours: $1,545/mo for 36 months.

Step 3: Job ZIP

Texas · Project quote

Routed from the nearest JOLT source yard.
Rent per month$1,495/mo

Delivery and pickup: quoted for your site.

Step 4: Send it

Where should we send your project quote?

Our project desk will send your written delivered quote by the next business day. It holds for 14 days.

On site by

Units

By tapping Show my delivered price you agree to JOLT's Terms of Service and Privacy Policy, and to a call or text from JOLT about your request.

Step 5: Your project quote

Lisa Tanner, Content Writer at JOLT

Page by Lisa Tanner · Content Writer

Get a call back

Talk to the JOLT project desk.

page form

Name, number, email and the job. Our team in Gypsum, Colorado calls you back.

A live, local person calls back within 15 minutes, business hours. Mon–Fri 7am⁠–⁠7pm MT.

By tapping Get a Call Back ASAP you agree to JOLT's Terms of Service and Privacy Policy, and to a call or text from JOLT about your request.

Lisa Tanner, Content Writer at JOLTBy , Content Writer · Updated

Placing an office in Irving

We help you plan the placement. Here is what Irving asks for. Identify the property's jurisdiction before using its postal address. Show the project owner the proposed occupied workroom. Mark tool storage separately on the site diagram. Ask Planning which use category fits each unit. Explain the planned construction phase to Building Inspections. If the project fronts a street, draw its public boundary. We can compare container sizes with the usable area. Keep both city and property-manager answers with the drawing. Update it when Irving construction changes site access.

On a private lot

Irving's Land Development Code page points to current development standards. Ask Planning which zoning district governs your actual parcel. The city's district provisions describe outside storage with screening in some districts. That language does not settle every construction-office use. Ask how a staffed office differs from outdoor materials storage. Draw the proposed occupied pad and any accessory box. Note required parking and fire access. Ask whether the existing site plan needs review. The manager of a Las Colinas campus should identify contractor-controlled space.

Irving's commercial permit guidance directs construction applications through My Government Online. Its building-code page lists 2024 International Code amendments effective May 1, 2026. Ask Building Inspections about the adopted temporary-structure provisions for this office. The model IBC provision for temporary structures is §3103.1.2. The reviewing official determines how it applies here. Give staff the unit size, occupied use and power plan. An Irving proposal for a 40 ft bathroom office includes an enclosed bathroom. Include that feature in any plumbing or utility discussion. A cargo storage box deserves its own land-use description.

On a street or sidewalk

Irving's right-of-way management ordinance addresses work and facilities in public space. Ask Public Works and Transportation about a proposed street position. Show the curb, travel lane and sidewalk together. Explain if the container would remain on public pavement. Explain separately if placement briefly affects circulation. Ask which temporary-obstruction process fits the actual site. A building permit for the adjoining parcel cannot answer the street question. Record the right-of-way staff's decision in the Irving site plan.

The city's road construction updates can help identify changing approaches. Check the listed work near the planned site entrance. A south Irving street site may have limited off-street staging. Ask whether its driveway remains open during the next road phase. On an office campus, a private drive may still intersect a public sidewalk. Draw both spaces for the reviewer. Keep hydrants and building entrances visible on the diagram. A permitted work lane is not automatically a place for a stationary office. Discuss another authorized parcel position if the street option fails.

HOA and deed restrictions

For an Irving residence, discuss a temporary box with the HOA. Ask about screening and driveway use under its covenants. Planning's district answer remains a separate question. A Las Colinas landlord may reserve spaces for tenants. Seek written consent for the particular office and storage positions. Identify any shared access easement on the campus drawing. A manager's permission does not confer control of a public curb. Keep private restrictions alongside the city's permit response.

At a client-facing Irving parcel, Alpine's exterior may matter. Its matte black envelope includes cedar surrounds. The covered entry deck uses additional site space. Show the actual build to an architectural committee. Ask whether that appearance suits the association's rules. A compact 10 ft storage box may fit a short approved area. Its man door and barred window sit on the long side. A 12 ft crib offers similar walk-in access. Ask the owner which position leaves tenant circulation open.

Getting the site ready

Mark a firm, level Irving pad on the drawing. Walk the access from the correct gate. Look for parked vehicles and overhead lines. A south Irving driveway may constrain the usable approach. A Las Colinas campus can have multiple managed entrances. Ask the property manager which one serves the work area. Account for drainage after heavy rain. Leave fire lanes, loading paths and hydrants accessible. Assign an authorized site contact the approved position.

Base connects through a 50-amp shore-power inlet at a suitable Irving site. Let the Irving site electrician plan the connection. Grid-Free needs no shore power at an Irving staging pad. Irving sun exposure and load determine its solar output. Check whether campus buildings shade the proposed roof. The Irving 20 ft storage option has a welded lockbox and cargo doors. Draw usable access for that separate unit. The Irving high-cube measures 9 ft 6 in vertically. Check overhead clearance on the actual approach. Review the diagram if street or building work shifts the entrance.

Where JOLT fits best

Irving's Road to the Future program covers a network of 1,440 lane-miles. A long street reconstruction job may need a stable off-road workroom. Tools can stay in a separately approved locked box. For Irving road work, we offer office and storage units from the same fleet. Identify every planned unit when discussing the road job with our project desk. Grid-Free helps when shore power is not established. A 12 ft crib can suit a limited staging area. Ask the road project owner which pad remains usable through later phases.

The city's capital-project list names several facility improvements. A yearlong campus renovation may need office space away from public activity. A Base workroom can serve a site with planned shore power. The 20 ft storage box has four lock bars for contractor materials. Ask the facility manager to approve both positions. Confirm the actual work package before selecting a unit. Listed projects are not all at the same construction stage. We can compare footprints with the current site diagram. Keep Irving's building and land-use decisions specific to that parcel.

Built for Irving weather

The NWS Dallas/Fort Worth regional normals report 37.01 inches of annual precipitation. They also report about 20 days reaching 100°F yearly. The regional station averages 29 freezes each season. Check conditions at your Irving campus too. Plan cooling for summer administration and heat for winter starts. Find a pad that stays usable after rain. Ask the manager where pavement drains around the proposed office.

Base has a mini-split for Irving cooling and heating. Base has lights, outlets and a 50-amp shore-power inlet for an Irving workroom. A suitable site connection needs an electrician's plan. Grid-Free includes built-in solar, Starlink and a camera. Its 10 kWh battery pack runs HVAC on an Irving project. Output at that Irving pad depends on sun and load. A shaded Las Colinas courtyard may change that output. Alpine adds backup heat, covered entry and standing-seam over-roof to an Irving office. Ask Building Inspections about site-specific requirements for an occupied structure.

For an Irving facility renovation, READY supplies a plan table. Two chairs and a whiteboard support drawing reviews. READY also brings a mini-fridge, microwave and 1,500 W heater to Irving. Choose Base when suitable shore power is arranged. Grid-Free is an option for an unpowered phase. Put materials in a separate approved storage box. The one-trip 20 ft unit has a welded lockbox. A 10 ft unit may fit a tighter south Irving area. Keep the chosen office accessible across changing seasons. Match the workroom to the actual occupancy plan.

Who rents JOLT offices in Irving

Road to the Future crews

The Road to the Future program began in 2017. Irving describes a 1,440-lane-mile street network. Ask the city which reconstruction phase is active. A road supervisor needs records outside active pavement work. Grid-Free may suit an off-road pad without shore power. Add a 20 ft locked storage box where the owner permits it. Check road construction updates for approach changes. Ask Public Works about any public-space occupation.

Irving roadway work can move between blocks. Keep the project workroom where the superintendent can reach it. Ask which staging entrance survives the next closure. A 12 ft crib may fit a smaller approved parcel. Its man door gives walk-in tool access. Record the storage position apart from the office. Ask Irving's project manager about approvals for the occupied office. Follow the current site directions.

Animal Care Campus projects

The city's capital-project list names an Animal Care Campus expansion. Ask its manager about the present construction phase. A facility project needs visitor and service access kept open. Mark those paths before choosing an office location. A Base unit can provide a dedicated workroom with planned power. A smaller 10 ft box might occupy the available materials pad. Ask Building Inspections about the occupied office. Keep storage use on the Planning drawing.

An Irving campus expansion can change its gate during work. Ask the owner about the next phase's access. The 40 ft bathroom office needs a longer approved pad. Its enclosed bathroom changes the utility conversation. Consider a 20 ft office if the parcel has less room. Let the facility manager review both possible positions. Match the selected unit to an actual authorized phase.

Fire Station 8 and City Hall work

Irving's capital-project list also names Fire Station 8. It lists City Hall complex renovations separately. Check each project's current status with the owner. A fire-station site needs emergency access preserved. A City Hall renovation may share space with public visitors. Put those movements on separate placement drawings. Grid-Free can support a workroom before shore power arrives. A 20 ft box can keep tools away from office records.

For Fire Station 8, ask which area remains clear for emergency vehicles. At City Hall, ask which public entrance remains active. A 12 ft crib can serve a tighter approved work zone. The office's exact occupied position goes to Building Inspections. Storage on the lot goes to Planning's use review. Use the owner's current schedule rather than the city's project list alone.

Library and Las Colinas renovations

Irving's capital-project list describes a public-library improvement program. A library contractor needs a workroom separate from visitors. Show the manager a proposed private pad and entry route. A Base office fits when shore power is arranged. A separate storage box can hold construction materials. The Loop at Las Colinas announcement describes an urban-center circulator. Ask campus managers about pedestrian routes before proposing a position.

A Las Colinas office remodel can take several construction phases. Ask the landlord whether the first pad lasts through all of them. A Grid-Free office includes Starlink and a camera. Grid-Free's HVAC battery output at Las Colinas depends on sun and load. Draw any courtyard shade before choosing that build. Keep a 10 ft storage unit on an authorized position. Ask Irving staff about any curb or sidewalk impact.

How we built this page: rent, upgrade and delivery figures come from the JOLT catalog at build time. Permit, street, HOA and weather facts are linked to their sources in the text. Written and reviewed by Lisa Tanner.

Last updated .

Lisa Tanner, Content Writer at JOLT

Page by Lisa Tanner · Content Writer

Get a call back

Talk to the JOLT project desk.

in the page

Name, number, email and the job. Our team in Gypsum, Colorado calls you back.

A live, local person calls back within 15 minutes, business hours. Mon–Fri 7am⁠–⁠7pm MT.

By tapping Get a Call Back ASAP you agree to JOLT's Terms of Service and Privacy Policy, and to a call or text from JOLT about your request.

Questions Irving contractors ask

What comes in a JOLT office for a Irving job?

Every 20 ft office has heat and A/C, lights, outlets, a vinyl-plank floor, a 36-inch steel door and two barred windows. Grid-Free adds roof solar, a 10 kWh battery, Starlink and a camera. Offices rent from $795 a month.

Can the office run before the site has power?

Yes. Grid-Free runs its heat and A/C, lights, outlets and Starlink from roof solar and a 10 kWh battery. Output depends on sun and load. It rents for $1,495 a month.

Can we put our logo on it?

Yes. BRAND applies your logo in 24 by 48 inch vinyl on two sides of the unit. $450, one time.

Do I need a permit for a jobsite office in Irving?

Possibly: Irving Building Inspections can determine the occupied office's building and trade review. The city's commercial permit guidance sends applications through My Government Online. Ask Planning how the Land Development Code treats your particular parcel and temporary use. Show both desks the office position, construction work, utilities and proposed duration.

Can the office sit on a Irving street?

Only after Irving Public Works and Transportation approves that particular public-space use. Its right-of-way management ordinance governs work and facilities in public space, rather than granting general permission for containers. Show staff the curb, sidewalk or lane involved and distinguish a stationary office from a brief obstruction. Ask about the application for the actual position.

What does the site need before delivery?

A firm, level pad, a clear path for the truck, and a person on site to show the driver where it goes. Tell us about gates, slopes and overhead lines when you ask for the quote.

How much does delivery to Irving cost?

Delivery to Irving is quoted per project. We route the unit from the nearest JOLT source yard and send a written delivered quote within one business day. It holds for 14 days. Rent is published: offices from $795 a month, storage from $225.

How long can we rent, and can we buy?

Rentals outside the Rockies start at 12 months. You can also buy an office outright or lease-to-own a 20 ft office over 24 or 36 months.

Start your Irving project quote

Offices from $795 a month

Pick the office, the term and the job ZIP. You get a written delivered quote within one business day, and it holds for 14 days.